Difference between revisions of "Gun Test Stand Meeting Minutes and To-Do Lists"

From Ciswikidb
Jump to navigation Jump to search
Line 2: Line 2:
  
 
'''2015'''
 
'''2015'''
 +
 +
:[[GTS meeting 8_25-15]]  More discussion re: shed optimization for gun Plan Z
  
 
:[[GTS meeting 8_18_15]]  Global GTS talking points, the big picture, VA beamline etc., to do list
 
:[[GTS meeting 8_18_15]]  Global GTS talking points, the big picture, VA beamline etc., to do list

Revision as of 12:30, 25 August 2015

Gun Test Stand Meetings

2015

GTS meeting 8_25-15 More discussion re: shed optimization for gun Plan Z
GTS meeting 8_18_15 Global GTS talking points, the big picture, VA beamline etc., to do list
GTS meeting 8_11_15 More poisson results, discuss revisiting the white R30 insulator + shed test
GTS meeting 8_4_15 Yan's poisson results, Danny's latest drawing, electrode inventory, insulator inventory
GTS meeting 7_14_15 discuss gun Plan Z
GTS meeting 7_7_15 kick off and to-do list, review Carlos' HV results
 media:Carlos' HV insulator paper_IEEE preprint.pdf