Difference between revisions of "Gun Test Stand Meeting Minutes and To-Do Lists"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
'''2015''' | '''2015''' | ||
+ | |||
+ | :[[GTS meeting 8_18_15]] Global GTS talking points, the big picture, VA beamline etc., to do list | ||
:[[GTS meeting 8_11_15]] More poisson results, discuss revisiting the white R30 insulator + shed test | :[[GTS meeting 8_11_15]] More poisson results, discuss revisiting the white R30 insulator + shed test |
Revision as of 08:50, 12 August 2015
Gun Test Stand Meetings
2015
- GTS meeting 8_18_15 Global GTS talking points, the big picture, VA beamline etc., to do list
- GTS meeting 8_11_15 More poisson results, discuss revisiting the white R30 insulator + shed test
- GTS meeting 8_4_15 Yan's poisson results, Danny's latest drawing, electrode inventory, insulator inventory
- GTS meeting 7_14_15 discuss gun Plan Z
- GTS meeting 7_7_15 kick off and to-do list, review Carlos' HV results
media:Carlos' HV insulator paper_IEEE preprint.pdf