Gun Test Stand Meeting Minutes and To-Do Lists

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Gun Test Stand Meetings

2016

GTS meeting 1_12_16 Update: Yan's optimized R30-shed, multi-alkali chamber work, GTS schedule drafting
GTS meeting 1_5_16 LDRD gun magnet design


2015

GTS meeting 12_15_15 optimized shed for today's gun plan Y
GTS meeting 12_8_15 status and to-do list
GTS meeting 12_1_15 status and to-do list
GTS meeting 11_13_15 present status of Plan Z (using the large FEL black insulators)
GTS meeting 11_10_15 SYSTEM R30 white + Shed & full electrode ready for High Voltage!!!.
GTS meeting 11_03_15 SYSTEM IS UNDER VACUUM!!!.
GTS meeting 10_27_15 Sheep chamber saga, electrode assembly update.
GTS meeting 10_20_15 Update on sheep chamber vacuum setup, electrodes and RadCon.
GTS meeting 10_06_15 Update on sheep chamber vacuum setup and electrode polishing.
GTS meeting 9_25_15 Update from Yan on fields from John's Shed, update on sheep chamber vacuum setup and electrode polishing.
GTS meeting 9_15_15 Met at the GTS with Danny and Josh, Sheep chamber attached to gun valve.
GTS meeting 9_8_15 350 kV vs 500 kV guns, Yan poisson field maps
GTS meeting 9_1_15 More discussion, optimized sheds and plan y and z
GTS meeting 8_25-15 More discussion re: shed optimization for gun Plan Z
GTS meeting 8_18_15 Global GTS talking points, the big picture, VA beamline etc., to do list
GTS meeting 8_11_15 More poisson results, discuss revisiting the white R30 insulator + shed test
GTS meeting 8_4_15 Yan's poisson results, Danny's latest drawing, electrode inventory, insulator inventory
GTS meeting 7_14_15 discuss gun Plan Z
GTS meeting 7_7_15 kick off and to-do list, review Carlos' HV results
 media:Carlos' HV insulator paper_IEEE preprint.pdf
 media:Desorption Paper by Diamond 2012.docx
  media:chapter_7_Microdischarges_in_UHV.pdf