Gun Test Stand Meeting Minutes and To-Do Lists

From Ciswikidb
Revision as of 10:24, 11 September 2017 by Suleiman (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Gun Test Stand Meetings

2017

GTS meeting 9_11_17 High current runs, differential orbits, shutdown plans
GTS meeting 8_28_17 Emittance measurements, shutdown plans
GTS meeting 8_21_17 Emittance measurements
GTS meeting 8_14_17 ASTRA simulation and emittance measurements, YAG facts.
GTS meeting 8_07_17 ASTRA simulation and emittance measurements
GTS meeting 7_31_17 ASTRA simulation and emittance measurements
GTS meeting 7_24_17 ASTRA simulation and emittance measurements
GTS meeting 7_17_17 Updates on magnetized beam sizes, ASTRA simulation and slit emittance measurement.
GTS meeting 7_10_17 Updates on magnetized beam sizes, ASTRA simulation and slit emittance measurement.
GTS meeting 7_03_17 Updates on magnetized beam sizes and rotation angles, ASTRA simulation and slit emittance measurement.
GTS meeting 6_26_17 Updates on magnetized beam sizes and rotation angles, ASTRA simulation and slit emittance measurement.
GTS meeting 6_19_17 Updates on magnetized beam sizes and rotation angles, ASTRA simulation and slit emittance measurement. Yan's UGM poster.
GTS meeting 6_15_17 Updated to-do list, discuss our simulation wish list
GTS meeting 6_12_17 Updates on magnetized beam sizes and rotation angles, emittance measurements, ASTRA simulation and slit emittance measurement
GTS meeting 6_05_17 JLab Annual Users' Group Meeting: Yan's Abstract and Poster Outline
GTS meeting 5_22_17 0.5 mA magnetized beam
GTS meeting 5_15_17 Instrumenting the Wire Scanner
GTS meeting 5_09_17 Meeting in LERF Break Room - Software Tasks
GTS meeting 5_02_17 Meeting in LERF Break Room - Attempting to deliver 1 mA - Cornell, Pozdeyev and Grames papers on ions, links to GTSLOG
GTS meeting 4_25_17 Meeting in LERF Break Room - Upgraded the laser system. Latest Drawings and 3D Views
GTS meeting 4_18_17 Meeting in LERF Break Room - Running beam to the dump
GTS meeting 4_11_17 Meeting in LERF Break Room - Finished bake of second part of beamline
GTS meeting 4_04_17 No Meeting - Open to finish second part of beamline - Summary of tasks for the down
GTS meeting 3_28_17 Meeting in LERF Break Room - Attempting to center gun solenoid - Emittance vs Gun HV
GTS meeting 3_21_17 Meeting in LERF Break Room - Attempting to center gun solenoid
GTS meeting 3_14_17 Meeting in GTS Control Room - Delivering magnetized beam. DO NOT TURN MAGNET ON WHILE GUN AT HV
GTS meeting 3_07_17 Meeting in GTS Control Room - GTS beam in ON
GTS meeting 2_28_17 Remaining Tasks - Very close to run beam
GTS meeting 2_21_17 Beamline and Prep Chamber successfully baked
GTS meeting 2_14_17 HV and Magnet conditioning seems to be OK for beam. Updates on cathode prep chamber and beam line. POISSON simulations comparing the T-electrode to the spherical electrode inside CEBAF style gun vacuum chamber
GTS meeting 2_07_17 HV and Magnet conditioning. Updates on cathode prep chamber and beam line
GTS meeting 1_17_17 Gun with Magnetized beam coil turned ON!!! Updates on cathode prep chamber and beam line
GTS meeting 1_3_17 Emittance measurement techniques


2016

GTS meeting 12_20_16 Gun conditioned to 350kV in vacuum, up to 365kV w/Kr, new scheme for puck grabbing in prep chamber, etc.
GTS meeting 12_06_16 High voltage conditioning with barrel polished electrodes, beam line, cathode solenoid magnet, etc...
GTS meeting 11_15_16 Laser power, gun bake update, beam line update
GTS meeting 11_08_16 Beamline update
GTS meeting 10_31_16 Gun HV chamber under vacuum, Improved Cathode prep chamber with Mamun's puck holder design is under vacuum!
GTS meeting 10_24_16 Gun HV chamber assembled, Cathode prep updates, beam line, P3 Workshop
GTS meeting 10_11_16 Updates: SS ball electrode assembly, gun chamber, prep chamber, beam line
GTS meeting 10_04_16 Updates on gun chamber, cathode prep and beam line.
GTS meeting 9_14_16 Shutdown work progress and discussion about photocathode 'arcing' during 1 mA beam runs, including Carlos' ERL'09 talk with FEL gun high current run observations.
GTS meeting 9_13_16 Shutdown work progress and really cool pictures of the removed multi-alkali photocathodes.
GTS meeting 8_30_16 Shutdown started!
GTS meeting 8_23_16 The way forward plan
GTS meeting 8_9_16 Discuss the new magnetized beamline
GTS meeting 7_25_16 Update since our last meeting, 1 mA for >6 hours!..battered cathode holds QE!!..QE scanner operational!!!...FE induced by hand-held magnet!!!!
GTS meeting 7_05_16 Better stability at 1 mA and 300kV with biased anode. Summary, what have we learned so far?
GTS meeting 6_27_16 100uA 300keV beam for 5 hr, but 1 mA attempts difficult. Summary of multi-alkali LN-cooled cathode work.
GTS meeting 6_20_16 Demonstrated 1 mA Beam at 275 keV!!!!
GTS meeting 6_14_16 Progress!!! Full control of laser power & first CsKSb cathode in TL1137 for the summer!
GTS meeting 5_31_16 1.6 uA 300keV DC beam on the dump!
GTS meeting 5_24_16 Struggling to keep the beam On. Some progress in diagnostics.
GTS meeting 5_17_16 The BEAM in ON!!!
GTS meeting 5_3_16 Getting ready for beam update, New puck drawings
GTS meeting 4_26_16 First multi-alkali photocathode in the GTS!
GTS meeting 4_12_16 Beamline, HV, Depo chamber, Barrel polishing surface characterization, and SCHEDULE
GTS meeting 4_5_16 Updates, and some HV.
GTS meeting 3_22_16 Updates.
GTS meeting 3_15_16 Beamline bake is done, and gun+per chamber bake is cooling down.
GTS meeting 3_8_16 Update on beamline instrumentation and bake
GTS meeting 3_2_16 Coil Procurement
GTS meeting 3_1_16 Gun magnet drawings and update on barrel polishing (Sheds) and cathode prep chamber.
GTS meeting 2_22_16 3D EM modeling of the GTS gun chamber with R30 insulator and electrode, update on prep chamber
GTS meeting 2_19_16 Discuss design tasks for Magnetized Beam LDRD
GTS meeting 2_16_16 Beamline magnets and diagnostics itemized list and LDRD gun magnet update
GTS meeting 2_9_16 Beamline and LDRD gun magnet updates
GTS meeting 2_2_16 LDRD gun magnet discussion & Shed for R30 black insulators
GTS Beamline 2_1_16 Beam line side view gun to dump with pics
GTS photos 1_29_16 Assembly of beam line and gun for LDRD
GTS meeting 1_26_16 Shed design and Beamline update
GTS meeting 1_19_16 Update: Yan's modeling with NEGs, Beamline update
GTS meeting 1_15_16 Meeting with Vashek Vylet about radiation shielding
GTS meeting 1_12_16 Update: Yan's optimized R30-shed, multi-alkali chamber work, GTS schedule drafting
GTS meeting 1_5_16 LDRD gun magnet design


2015

GTS meeting 12_15_15 optimized shed for today's gun plan Y
GTS meeting 12_8_15 status and to-do list
GTS meeting 12_1_15 status and to-do list
GTS meeting 11_13_15 present status of Plan Z (using the large FEL black insulators)
GTS meeting 11_10_15 SYSTEM R30 white + Shed & full electrode ready for High Voltage!!!.
GTS meeting 11_03_15 SYSTEM IS UNDER VACUUM!!!.
GTS meeting 10_27_15 Sheep chamber saga, electrode assembly update.
GTS meeting 10_20_15 Update on sheep chamber vacuum setup, electrodes and RadCon.
GTS meeting 10_06_15 Update on sheep chamber vacuum setup and electrode polishing.
GTS meeting 9_25_15 Update from Yan on fields from John's Shed, update on sheep chamber vacuum setup and electrode polishing.
GTS meeting 9_15_15 Met at the GTS with Danny and Josh, Sheep chamber attached to gun valve.
GTS meeting 9_8_15 350 kV vs 500 kV guns, Yan poisson field maps
GTS meeting 9_1_15 More discussion, optimized sheds and plan y and z
GTS meeting 8_25-15 More discussion re: shed optimization for gun Plan Z
GTS meeting 8_18_15 Global GTS talking points, the big picture, VA beamline etc., to do list
GTS meeting 8_11_15 More poisson results, discuss revisiting the white R30 insulator + shed test
GTS meeting 8_4_15 Yan's poisson results, Danny's latest drawing, electrode inventory, insulator inventory
GTS meeting 7_14_15 discuss gun Plan Z
GTS meeting 7_7_15 kick off and to-do list, review Carlos' HV results


To-Do Lists

GTS Improvement List - Summer / Fall 2016 Plans to improve on GTS when installing magnetized beam cathode magnet