Difference between revisions of "HDIce tile removal predictions: October 9, 2019"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
|3 | |3 | ||
|4 | |4 | ||
+ | |5 | ||
|- | |- | ||
|Objective | |Objective | ||
− | | | + | |IBC installation |
− | |Aperture target | + | |Booster Commissioning |
+ | |Aperture target/Empty Target | ||
|Unpolarized Target | |Unpolarized Target | ||
|Polarized Target | |Polarized Target | ||
Line 18: | Line 20: | ||
|Tiles OFF and ON sequence | |Tiles OFF and ON sequence | ||
|OFF/ON | |OFF/ON | ||
+ | |- | ||
|OFF/ON | |OFF/ON | ||
|OFF/ON/OFF/ON | |OFF/ON/OFF/ON | ||
Line 25: | Line 28: | ||
|# times Neil visits the rooftop | |# times Neil visits the rooftop | ||
|2 (done) | |2 (done) | ||
+ | |0 | ||
|2 | |2 | ||
|4 | |4 |
Revision as of 13:41, 7 November 2019
Andy's proposed run plan, the hard part is scheduling this work before May 2020. And lots of rooftop manipulations:
Run# | 0 | 1 | 2 | 3 | 4 | 5 |
Objective | IBC installation | Booster Commissioning | Aperture target/Empty Target | Unpolarized Target | Polarized Target | Polarized Target |
Tiles OFF and ON sequence | OFF/ON | |||||
OFF/ON | OFF/ON/OFF/ON | OFF/ON/OFF/ON/OFF/ON | OFF/ON/OFF/ON/OFF/ON | |||
# times Neil visits the rooftop | 2 (done) | 0 | 2 | 4 | 6 | 6 |