Difference between revisions of "HDIce tile removal predictions: October 9, 2019"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
{| class="wikitable" style="text-align: center; color: green;" | {| class="wikitable" style="text-align: center; color: green;" | ||
|Run# | |Run# | ||
+ | |0 | ||
|1 | |1 | ||
|2 | |2 | ||
Line 9: | Line 10: | ||
|- | |- | ||
|Objective | |Objective | ||
+ | |Aperture target | ||
|Empty Target | |Empty Target | ||
|Unpolarized Target | |Unpolarized Target | ||
Line 15: | Line 17: | ||
|- | |- | ||
|Tiles OFF and ON sequence | |Tiles OFF and ON sequence | ||
+ | |OFF/ON (done) | ||
|OFF/ON | |OFF/ON | ||
|OFF/ON/OFF/ON | |OFF/ON/OFF/ON | ||
Line 21: | Line 24: | ||
|- | |- | ||
|# times Neil visits the rooftop | |# times Neil visits the rooftop | ||
+ | |2 | ||
|2 | |2 | ||
|4 | |4 |
Revision as of 17:50, 6 November 2019
Andy's proposed run plan, the hard part is scheduling this work before May 2020. And lots of rooftop manipulations:
Run# | 0 | 1 | 2 | 3 | 4 |
Objective | Aperture target | Empty Target | Unpolarized Target | Polarized Target | Polarized Target |
Tiles OFF and ON sequence | OFF/ON (done) | OFF/ON | OFF/ON/OFF/ON | OFF/ON/OFF/ON/OFF/ON | OFF/ON/OFF/ON/OFF/ON |
# times Neil visits the rooftop | 2 | 2 | 4 | 6 | 6 |