Difference between revisions of "HDIce tile removal predictions: October 9, 2019"
Jump to navigation
Jump to search
(Objective) |
|||
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | {| | + | (this page was updated November 7, 2019) |
− | | | + | |
+ | Andy's proposed run plan, the hard part is scheduling this work before May 2020. And lots of rooftop manipulations: | ||
+ | |||
+ | {| class="wikitable" style="text-align: center; color: green;" | ||
+ | |Run# | ||
+ | |X | ||
+ | |0 | ||
+ | |1 | ||
+ | |2 | ||
+ | |3 | ||
+ | |4 | ||
|- | |- | ||
− | | | + | |Objective |
+ | |IBC installation | ||
+ | |Booster Commissioning | ||
+ | |Aperture target/Empty Target | ||
+ | |Unpolarized Target | ||
+ | |Polarized Target | ||
+ | |Polarized Target | ||
|- | |- | ||
− | | | + | |Tiles OFF and ON sequence |
+ | |OFF/ON | ||
+ | |not required | ||
+ | |OFF/ON | ||
+ | |OFF/ON/OFF/ON | ||
+ | |OFF/ON/OFF/ON/OFF/ON | ||
+ | |OFF/ON/OFF/ON/OFF/ON | ||
|- | |- | ||
− | | | + | |# times Neil visits the rooftop |
− | | | + | |2 (done) |
− | | | + | |0 |
+ | |2 | ||
+ | |4 | ||
+ | |6 | ||
+ | |6 | ||
|} | |} |
Latest revision as of 15:19, 7 November 2019
(this page was updated November 7, 2019)
Andy's proposed run plan, the hard part is scheduling this work before May 2020. And lots of rooftop manipulations:
Run# | X | 0 | 1 | 2 | 3 | 4 |
Objective | IBC installation | Booster Commissioning | Aperture target/Empty Target | Unpolarized Target | Polarized Target | Polarized Target |
Tiles OFF and ON sequence | OFF/ON | not required | OFF/ON | OFF/ON/OFF/ON | OFF/ON/OFF/ON/OFF/ON | OFF/ON/OFF/ON/OFF/ON |
# times Neil visits the rooftop | 2 (done) | 0 | 2 | 4 | 6 | 6 |