Difference between revisions of "HDIce tile removal predictions: October 9, 2019"

From Ciswikidb
Jump to navigation Jump to search
(Objective)
 
 
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
{|
+
(this page was updated November 7, 2019)
| Run# || Objective || Tiles OFF/ON sequence|| # times Neil visit rooftop
+
 
 +
Andy's proposed run plan, the hard part is scheduling this work before May 2020.  And lots of rooftop manipulations:
 +
 
 +
{| class="wikitable" style="text-align: center; color: green;"
 +
|Run#
 +
|X
 +
|0
 +
|1
 +
|2
 +
|3
 +
|4
 
|-
 
|-
|   1 || Empty Target || OFF/ON  || 2
+
|Objective
 +
|IBC installation
 +
|Booster Commissioning
 +
|Aperture target/Empty Target
 +
|Unpolarized Target
 +
|Polarized Target
 +
|Polarized Target
 
|-
 
|-
|   2 || Target Unpolarized || OFF/ON/OFF/ON || 4
+
|Tiles OFF and ON sequence
 +
|OFF/ON
 +
|not required
 +
|OFF/ON
 +
|OFF/ON/OFF/ON
 +
|OFF/ON/OFF/ON/OFF/ON
 +
|OFF/ON/OFF/ON/OFF/ON
 
|-
 
|-
|   3 || Target Polarized || OFF/ON/OFF/ON/OFF/ON || 6
+
|# times Neil visits the rooftop
|-
+
|2 (done)
|   4 || Target Polarized || OFF/ON/OFF/ON/OFF/ON || 6
+
|0
 +
|2
 +
|4
 +
|6
 +
|6
 
|}
 
|}

Latest revision as of 15:19, 7 November 2019

(this page was updated November 7, 2019)

Andy's proposed run plan, the hard part is scheduling this work before May 2020. And lots of rooftop manipulations:

Run# X 0 1 2 3 4
Objective IBC installation Booster Commissioning Aperture target/Empty Target Unpolarized Target Polarized Target Polarized Target
Tiles OFF and ON sequence OFF/ON not required OFF/ON OFF/ON/OFF/ON OFF/ON/OFF/ON/OFF/ON OFF/ON/OFF/ON/OFF/ON
# times Neil visits the rooftop 2 (done) 0 2 4 6 6