Difference between revisions of "HDIce tile removal predictions: October 9, 2019"

From Ciswikidb
Jump to navigation Jump to search
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
{|
+
(this page was updated November 7, 2019)
|  Run# || Objective || Tiles OFF/ON sequence|| # times Neil visit rooftop
 
|-
 
|  1 || Empty Target || OFF/ON  || 2
 
|-
 
|  2 || Target Unpolarized || OFF/ON/OFF/ON || 4
 
|-
 
|  3 || Target Polarized || OFF/ON/OFF/ON/OFF/ON || 6
 
|-
 
|  4 || Target Polarized || OFF/ON/OFF/ON/OFF/ON || 6
 
|}
 
  
 +
Andy's proposed run plan, the hard part is scheduling this work before May 2020.  And lots of rooftop manipulations:
  
 
{| class="wikitable" style="text-align: center; color: green;"
 
{| class="wikitable" style="text-align: center; color: green;"
 
|Run#
 
|Run#
 +
|X
 +
|0
 
|1
 
|1
 
|2
 
|2
Line 20: Line 13:
 
|-
 
|-
 
|Objective
 
|Objective
|Empty Target
+
|IBC installation
 +
|Booster Commissioning
 +
|Aperture target/Empty Target
 
|Unpolarized Target
 
|Unpolarized Target
 
|Polarized Target
 
|Polarized Target
Line 26: Line 21:
 
|-
 
|-
 
|Tiles OFF and ON sequence
 
|Tiles OFF and ON sequence
 +
|OFF/ON
 +
|not required
 
|OFF/ON
 
|OFF/ON
 
|OFF/ON/OFF/ON
 
|OFF/ON/OFF/ON
Line 32: Line 29:
 
|-
 
|-
 
|# times Neil visits the rooftop
 
|# times Neil visits the rooftop
 +
|2 (done)
 +
|0
 
|2
 
|2
 
|4
 
|4

Latest revision as of 15:19, 7 November 2019

(this page was updated November 7, 2019)

Andy's proposed run plan, the hard part is scheduling this work before May 2020. And lots of rooftop manipulations:

Run# X 0 1 2 3 4
Objective IBC installation Booster Commissioning Aperture target/Empty Target Unpolarized Target Polarized Target Polarized Target
Tiles OFF and ON sequence OFF/ON not required OFF/ON OFF/ON/OFF/ON OFF/ON/OFF/ON/OFF/ON OFF/ON/OFF/ON/OFF/ON
# times Neil visits the rooftop 2 (done) 0 2 4 6 6