Beam line components

  • Vacuum
    • ~ 8 meters of beam line, mostly drift, 602 valve should be enough
    • Are extra valves around the HK needed?
    • Ion pump + viewer assemblies: 1 before HK, 1 after HK, 1 after quads (close to harp). Can reuse at least two (from 600 and 900 line)
  • Magnets
    • MeV Quadrupoles (+ power supply channels): 2; available from dismantled 900 line
    • Correctors (+ power supply channels): 5; available
  • Instrumentation
    • BPMs + low-rep-rate-capable receivers: 4; find out what can be reused
    • Harp: 1, after quads; may need to be new
    • Dump: could be reused from 900 line
  • other RF
    • 1497 MHz buncher: new