Difference between revisions of "Ion Pump Power Supplies"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
Let's meet on Wednesday from 3-4pm in TL-1227 to discuss possible CEBAF injector vacuum upgrades.
 
Let's meet on Wednesday from 3-4pm in TL-1227 to discuss possible CEBAF injector vacuum upgrades.
  
;Review Marcy/Daniel survey of injector IP power supplies
+
;Overview
:Injector Upgrade
+
:Injector Upgrade - Gun through Quarter, maybe through FC2 gate is being rebuilt
:Timeline/Opportunities - SAD (Aug-Oct, 2019), Booster Install (May 2020),
+
:Timeline/Opportunities - SAD (Aug-Oct, 2019), Upgrade (May 6, 2020 ... for 6 months)
:Injector IP list [[media:190220_IP_Summary.xlsx]]
+
:Review Marcy/Daniel survey of injector IP power supplies [[media:190220_IP_Summary.xlsx]]
  
;Upgrade Pathways
+
;Existing Power Supplies
:List future IP PS requirements & support (John's serial UHV, Digitel, ?)
+
:John's serial UHV work => unique design (low power 100uA, have interlock option, digital comm for readback, HV set, interlock limit?)
:INC owning/developing/standardizing John's UHV design
+
:Digitel supplies work => aging, poor resolution (high power mA, many ganged pumps, analog ADC readback, interlock limit boxes?)
:Specs of John's UHV IP power supply
 
  
;What else?
+
;IP PS Upgrade Considerations
 +
:Ion pumps
 +
:: Provide holding voltage with nA or uA curren
 +
:: Provide starting current of X uA?
 +
:: Independence (Adjust HV set on any IP, monitor current on any IP, interlock any IP)
 +
:: Still require some high power supplies available for bakes, activation, readback helpful, interlock probably not necessary
 +
:Power supplies
 +
::Gamma SPC => experience in rest of machine, nA resolution, EPICSs
 +
::INC UHV => INC own/evolve design?, used at UITF, sub-nA resolution

Revision as of 09:49, 20 February 2019

Let's meet on Wednesday from 3-4pm in TL-1227 to discuss possible CEBAF injector vacuum upgrades.

Overview
Injector Upgrade - Gun through Quarter, maybe through FC2 gate is being rebuilt
Timeline/Opportunities - SAD (Aug-Oct, 2019), Upgrade (May 6, 2020 ... for 6 months)
Review Marcy/Daniel survey of injector IP power supplies media:190220_IP_Summary.xlsx
Existing Power Supplies
John's serial UHV work => unique design (low power 100uA, have interlock option, digital comm for readback, HV set, interlock limit?)
Digitel supplies work => aging, poor resolution (high power mA, many ganged pumps, analog ADC readback, interlock limit boxes?)
IP PS Upgrade Considerations
Ion pumps
Provide holding voltage with nA or uA curren
Provide starting current of X uA?
Independence (Adjust HV set on any IP, monitor current on any IP, interlock any IP)
Still require some high power supplies available for bakes, activation, readback helpful, interlock probably not necessary
Power supplies
Gamma SPC => experience in rest of machine, nA resolution, EPICSs
INC UHV => INC own/evolve design?, used at UITF, sub-nA resolution