== Agenda ==
 
== Agenda ==
  
=== CEBAF/UITF jobs ===
+
=== Upcoming CEBAF/UITF jobs ===
 
* 200 kV status https://logbooks.jlab.org/entry/4116183
 
* 200 kV status https://logbooks.jlab.org/entry/4116183
 
* Matt's recommendation for vacuum work [[media:Source Group task suggestions 1_24_2023.docx]]
 
* Matt's recommendation for vacuum work [[media:Source Group task suggestions 1_24_2023.docx]]
 +
* Booster/HDIce removal from UITF
 +
* Other jobs ... laser upgrade, Moller upgrades, ?
  
 
=== General Announcements ===
 
=== General Announcements ===
Line 9: Line 11:
 
* Annual HR review process wrapping up, start setting up supervisor meetings
 
* Annual HR review process wrapping up, start setting up supervisor meetings
 
* COVID-19 community level downgraded to "low", so masks are no longer required in meetings
 
* COVID-19 community level downgraded to "low", so masks are no longer required in meetings
 +
* Tally committees, roles you have/serve on, can be internal/external... send to me within 1 week
  
=== Meetings ===
+
=== Upcoming Meetings/Dates ===
 +
* February 13, Xelera visit for e+ SBIR Phase 1 (awarded for liquid GaInSn target)
 
* March 5-10, APS Meeting Las Vegas (Riad, Matt, ?)
 
* March 5-10, APS Meeting Las Vegas (Riad, Matt, ?)
 
* March 7-8, positron physics workshop U. Va
 
* March 7-8, positron physics workshop U. Va
 
* March 8-10, JLab Accelerator Advisory Committee Review
 
* March 8-10, JLab Accelerator Advisory Committee Review
 +
* March 20, SAD begins!
 +
* March 23-24, KEK visit Yoshinori+
 
* May 7-12, IPAC'23
 
* May 7-12, IPAC'23
 
** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". [[media:abstract-1233.pdf]]
 
** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". [[media:abstract-1233.pdf]]

Latest revision as of 11:55, 24 January 2023

Agenda

Upcoming CEBAF/UITF jobs

General Announcements

  • Shukui and Aziz published paper https://aip.scitation.org/doi/10.1063/5.0130884
  • Annual HR review process wrapping up, start setting up supervisor meetings
  • COVID-19 community level downgraded to "low", so masks are no longer required in meetings
  • Tally committees, roles you have/serve on, can be internal/external... send to me within 1 week

Upcoming Meetings/Dates

  • February 13, Xelera visit for e+ SBIR Phase 1 (awarded for liquid GaInSn target)
  • March 5-10, APS Meeting Las Vegas (Riad, Matt, ?)
  • March 7-8, positron physics workshop U. Va
  • March 8-10, JLab Accelerator Advisory Committee Review
  • March 20, SAD begins!
  • March 23-24, KEK visit Yoshinori+
  • May 7-12, IPAC'23

R&D/Project/Student updates