Difference between revisions of "Jan 24, 2023 - CIS Group meeting"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "== Agenda == === CEBAF/UITF jobs === * 200 kV status https://logbooks.jlab.org/entry/4116183 * Matt's recommendation for vacuum work media:Source Group task suggestions 1_2...")
 
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Agenda ==
 
== Agenda ==
  
=== CEBAF/UITF jobs ===
+
=== Upcoming CEBAF/UITF jobs ===
 
* 200 kV status https://logbooks.jlab.org/entry/4116183
 
* 200 kV status https://logbooks.jlab.org/entry/4116183
 
* Matt's recommendation for vacuum work [[media:Source Group task suggestions 1_24_2023.docx]]
 
* Matt's recommendation for vacuum work [[media:Source Group task suggestions 1_24_2023.docx]]
 +
* Booster/HDIce removal from UITF
 +
* Other jobs ... laser upgrade, Moller upgrades, ?
  
 
=== General Announcements ===
 
=== General Announcements ===
 +
* Shukui and Aziz published paper https://aip.scitation.org/doi/10.1063/5.0130884
 +
* Annual HR review process wrapping up, start setting up supervisor meetings
 
* COVID-19 community level downgraded to "low", so masks are no longer required in meetings
 
* COVID-19 community level downgraded to "low", so masks are no longer required in meetings
* If you're going to IPAC'23 work with Tristan
+
* Tally committees, roles you have/serve on, can be internal/external... send to me within 1 week
  
=== Meetings ===
+
=== Upcoming Meetings/Dates ===
 +
* February 13, Xelera visit for e+ SBIR Phase 1 (awarded for liquid GaInSn target)
 
* March 5-10, APS Meeting Las Vegas (Riad, Matt, ?)
 
* March 5-10, APS Meeting Las Vegas (Riad, Matt, ?)
 
* March 7-8, positron physics workshop U. Va
 
* March 7-8, positron physics workshop U. Va
 
* March 8-10, JLab Accelerator Advisory Committee Review
 
* March 8-10, JLab Accelerator Advisory Committee Review
 +
* March 20, SAD begins!
 +
* March 23-24, KEK visit Yoshinori+
 
* May 7-12, IPAC'23
 
* May 7-12, IPAC'23
 
** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". [[media:abstract-1233.pdf]]
 
** G. Blume et al., "A 5 MeV Compton transmission polarimeter designed for a SRF photogun". [[media:abstract-1233.pdf]]
 
** J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" [[media:abstract-1313.pdf]]
 
** J. Grames et al., "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" [[media:abstract-1313.pdf]]
** R. Kazimi et al., "Polarized Electron Injector for Positron Capability at CEBAF 12 GeV" [[media:abstract-1917.pdf]]
 
** S. Pokharel et al., "Multi-Objective Genetic Optimization of the CEBAF Injector at 200 kV"  [[media:Sunil-IPAC23.pdf]]
 
 
** M. Rahman et al., "Quantum Efficiency and Lifetime Study for Negative Electron Affinity GaAs Nanopillar Array Photocathode" [[media:IPAC23 abstract_Aziz.pdf]]
 
** M. Rahman et al., "Quantum Efficiency and Lifetime Study for Negative Electron Affinity GaAs Nanopillar Array Photocathode" [[media:IPAC23 abstract_Aziz.pdf]]
** A. Sy et al., "Degrader beamline design at the CEBAF injector for machine acceptance studies" [[media:Amy_Sy-IPAC23.pdf]]
 
 
** A. Ushakov et al., "Conceptual Design of a High-Power Target for Positron Production at CEBAF" [[media:abstract-1794.pdf]]
 
** A. Ushakov et al., "Conceptual Design of a High-Power Target for Positron Production at CEBAF" [[media:abstract-1794.pdf]]
 
** S. Zhang, "What We Learned From Operating Electron Accelerators with Variable bunch Frequencies at JLab" [[media:IPAC23 abstract_Zhang.pdf]]
 
** S. Zhang, "What We Learned From Operating Electron Accelerators with Variable bunch Frequencies at JLab" [[media:IPAC23 abstract_Zhang.pdf]]
 +
 +
=== R&D/Project/Student updates ===

Latest revision as of 11:55, 24 January 2023

Agenda

Upcoming CEBAF/UITF jobs

General Announcements

  • Shukui and Aziz published paper https://aip.scitation.org/doi/10.1063/5.0130884
  • Annual HR review process wrapping up, start setting up supervisor meetings
  • COVID-19 community level downgraded to "low", so masks are no longer required in meetings
  • Tally committees, roles you have/serve on, can be internal/external... send to me within 1 week

Upcoming Meetings/Dates

  • February 13, Xelera visit for e+ SBIR Phase 1 (awarded for liquid GaInSn target)
  • March 5-10, APS Meeting Las Vegas (Riad, Matt, ?)
  • March 7-8, positron physics workshop U. Va
  • March 8-10, JLab Accelerator Advisory Committee Review
  • March 20, SAD begins!
  • March 23-24, KEK visit Yoshinori+
  • May 7-12, IPAC'23

R&D/Project/Student updates