From last week...
ME updates
- Danny has updated layout w/ correct chopper beamline solenoids
- Shaun has developed a design to fixture and align the beam line solenoids
- Phil is tallying available BPM's types (tunnel + labs)
- Marcy is checking on metallized YAG screen w/ hole
- Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
- Shaun/Joe are working to get laser room and outrigger table into CAD model