Difference between revisions of "January 23, 2020 - Mechanical engineering"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
==ME updates== | ==ME updates== | ||
− | |||
* Shaun has developed a design to fixture and align the beam line solenoids | * Shaun has developed a design to fixture and align the beam line solenoids | ||
+ | : Updates? | ||
* Phil is tallying available BPM's types (tunnel + labs) | * Phil is tallying available BPM's types (tunnel + labs) | ||
+ | : ? | ||
* Marcy is checking on metallized YAG screen w/ hole | * Marcy is checking on metallized YAG screen w/ hole | ||
+ | : ? | ||
* Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2" | * Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2" | ||
+ | : Danny updated layout, will pass along to modelers | ||
* Shaun/Joe are working to get laser room and outrigger table into CAD model | * Shaun/Joe are working to get laser room and outrigger table into CAD model | ||
+ | :In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox | ||
+ | :Joe put photos on OneDrive, has dwg info for Shaun | ||
+ | * Joe gave Chase info for magnet names | ||
+ | : ...waiting | ||
==Quick links== | ==Quick links== |
Revision as of 21:01, 22 January 2020
From last week...
ME updates
- Shaun has developed a design to fixture and align the beam line solenoids
- Updates?
- Phil is tallying available BPM's types (tunnel + labs)
- ?
- Marcy is checking on metallized YAG screen w/ hole
- ?
- Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
- Danny updated layout, will pass along to modelers
- Shaun/Joe are working to get laser room and outrigger table into CAD model
- In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox
- Joe put photos on OneDrive, has dwg info for Shaun
- Joe gave Chase info for magnet names
- ...waiting