Difference between revisions of "January 23, 2020 - Mechanical engineering"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
==ME updates== | ==ME updates== | ||
− | * Shaun has developed a design to fixture and align the beam line solenoids | + | * Shaun has developed a design to fixture and align the beam line solenoids => updates? |
− | + | * Phil is tallying available BPM's types (tunnel + labs) => ? | |
− | * Phil is tallying available BPM's types (tunnel + labs) | + | * Marcy is checking on metallized YAG screen w/ hole => ? |
− | + | * Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2" => Danny updated layout, will pass along to modelers | |
− | * Marcy is checking on metallized YAG screen w/ hole | ||
− | |||
− | * Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2" | ||
− | |||
* Shaun/Joe are working to get laser room and outrigger table into CAD model | * Shaun/Joe are working to get laser room and outrigger table into CAD model | ||
: => In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox | : => In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox | ||
: => Joe put photos on OneDrive, has dwg info for Shaun | : => Joe put photos on OneDrive, has dwg info for Shaun | ||
− | * Joe gave Chase info for magnet names | + | * Joe gave Chase info for magnet names => ...waiting |
− | : => ... | + | * Modelers... |
+ | : => Reza and Alicia are on the hook to provide a sequence next tuesday's 1/28 meeting | ||
+ | : => Dennis is ready to put any layout into elegant to test optics, then we iterate | ||
+ | * A1/A2 => Reza is wondering about PSS kicker to A1, and A2 being remotely insertable (like A3 or A4) | ||
+ | * Chopping chamber => fc#1 bellow is leaky, will need to replace this summer (if not sooner), so beam line will be vented... | ||
+ | * Advanced Booster work => Neil is looking at plan to remove 5D beam line and construct support plates for 4500 lb QCM or Booster | ||
==Quick links== | ==Quick links== |
Latest revision as of 21:08, 22 January 2020
From last week...
ME updates
- Shaun has developed a design to fixture and align the beam line solenoids => updates?
- Phil is tallying available BPM's types (tunnel + labs) => ?
- Marcy is checking on metallized YAG screen w/ hole => ?
- Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2" => Danny updated layout, will pass along to modelers
- Shaun/Joe are working to get laser room and outrigger table into CAD model
- => In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox
- => Joe put photos on OneDrive, has dwg info for Shaun
- Joe gave Chase info for magnet names => ...waiting
- Modelers...
- => Reza and Alicia are on the hook to provide a sequence next tuesday's 1/28 meeting
- => Dennis is ready to put any layout into elegant to test optics, then we iterate
- A1/A2 => Reza is wondering about PSS kicker to A1, and A2 being remotely insertable (like A3 or A4)
- Chopping chamber => fc#1 bellow is leaky, will need to replace this summer (if not sooner), so beam line will be vented...
- Advanced Booster work => Neil is looking at plan to remove 5D beam line and construct support plates for 4500 lb QCM or Booster