(Created page with "From last week... ==ME updates== * Danny has updated layout w/ correct chopper beamline solenoids * Shaun has developed a design to fixture and align the beam line solenoids...")
 
Line 8: Line 8:
 
* Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
 
* Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
 
* Shaun/Joe are working to get laser room and outrigger table into CAD model
 
* Shaun/Joe are working to get laser room and outrigger table into CAD model
 +
 +
==Quick links==
 +
* [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABNsJ15YGBFTQkkMenD_ommQ Link to AIPINJ OneDrive folder]
 +
 +
* [[AIPINJ Layouts]]

Revision as of 20:56, 22 January 2020

From last week...

ME updates

  • Danny has updated layout w/ correct chopper beamline solenoids
  • Shaun has developed a design to fixture and align the beam line solenoids
  • Phil is tallying available BPM's types (tunnel + labs)
  • Marcy is checking on metallized YAG screen w/ hole
  • Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
  • Shaun/Joe are working to get laser room and outrigger table into CAD model

Quick links