Difference between revisions of "January 23, 2020 - Mechanical engineering"

From Ciswikidb
Jump to navigation Jump to search
Line 2: Line 2:
  
 
==ME updates==
 
==ME updates==
* Danny has updated layout w/ correct chopper beamline solenoids
 
 
* Shaun has developed a design to fixture and align the beam line solenoids
 
* Shaun has developed a design to fixture and align the beam line solenoids
 +
: Updates?
 
* Phil is tallying available BPM's types (tunnel + labs)
 
* Phil is tallying available BPM's types (tunnel + labs)
 +
: ?
 
* Marcy is checking on metallized YAG screen w/ hole  
 
* Marcy is checking on metallized YAG screen w/ hole  
 +
: ?
 
* Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
 
* Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
 +
: Danny updated layout, will pass along to modelers
 
* Shaun/Joe are working to get laser room and outrigger table into CAD model
 
* Shaun/Joe are working to get laser room and outrigger table into CAD model
 +
:In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox
 +
:Joe put photos on OneDrive, has dwg info for Shaun
 +
* Joe gave Chase info for magnet names
 +
: ...waiting
  
 
==Quick links==
 
==Quick links==

Revision as of 21:01, 22 January 2020

From last week...

ME updates

  • Shaun has developed a design to fixture and align the beam line solenoids
Updates?
  • Phil is tallying available BPM's types (tunnel + labs)
?
  • Marcy is checking on metallized YAG screen w/ hole
?
  • Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
Danny updated layout, will pass along to modelers
  • Shaun/Joe are working to get laser room and outrigger table into CAD model
In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox
Joe put photos on OneDrive, has dwg info for Shaun
  • Joe gave Chase info for magnet names
...waiting

Quick links