* Shaun has developed a design to fixture and align the beam line solenoids
+
* Shaun has developed a design to fixture and align the beam line solenoids => updates?
: => updates?
+
* Phil is tallying available BPM's types (tunnel + labs) => ?
* Phil is tallying available BPM's types (tunnel + labs)
+
* Marcy is checking on metallized YAG screen w/ hole => ?
: => ?
+
* Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2" => Danny updated layout, will pass along to modelers
* Marcy is checking on metallized YAG screen w/ hole  
 
: => ?
 
* Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2"
 
: => Danny updated layout, will pass along to modelers
 
 
* Shaun/Joe are working to get laser room and outrigger table into CAD model
 
* Shaun/Joe are working to get laser room and outrigger table into CAD model
 
: => In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox
 
: => In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox
 
: => Joe put photos on OneDrive, has dwg info for Shaun
 
: => Joe put photos on OneDrive, has dwg info for Shaun
* Joe gave Chase info for magnet names
+
* Joe gave Chase info for magnet names => ...waiting
: => ...waiting
 
 
* Modelers...
 
* Modelers...
: Reza and Alicia are on the hook to provide a sequence next tuesday's 1/28 meeting
+
: => Reza and Alicia are on the hook to provide a sequence next tuesday's 1/28 meeting
: Dennis is ready to put any layout into elegant to test optics, then we iterate  
+
: => Dennis is ready to put any layout into elegant to test optics, then we iterate  
* A1/A2
+
* A1/A2 => Reza is wondering about PSS kicker to A1, and A2 being remotely insertable (like A3 or A4)
: => Reza is wondering about PSS kicker to A1, and A2 being remotely insertable (like A3 or A4)
+
* Chopping chamber => fc#1 bellow is leaky, will need to replace this summer (if not sooner), so beam line will be vented...
* Chopping chamber
+
* Advanced Booster work => Neil is looking at plan to remove 5D beam line and construct support plates for 4500 lb QCM or Booster
: => fc#1 bellow is leaky, will need to replace this summer (if not sooner), so beam line will be vented...
 
* Advanced Booster work
 
: => Neil is looking at plan to remove 5D beam line and construct support plates for 4500 lb QCM or Booster
 
  
 
==Quick links==
 
==Quick links==

Latest revision as of 21:08, 22 January 2020

From last week...

ME updates

  • Shaun has developed a design to fixture and align the beam line solenoids => updates?
  • Phil is tallying available BPM's types (tunnel + labs) => ?
  • Marcy is checking on metallized YAG screen w/ hole => ?
  • Joe is coordinating test of laser window size 2-3/4" vs. 4-1/2" => Danny updated layout, will pass along to modelers
  • Shaun/Joe are working to get laser room and outrigger table into CAD model
=> In /group/inj_group/hansknect/ => D:\My Documents from jlab work pc\AutoCad\cleanroom designs\OuterlaserBox
=> Joe put photos on OneDrive, has dwg info for Shaun
  • Joe gave Chase info for magnet names => ...waiting
  • Modelers...
=> Reza and Alicia are on the hook to provide a sequence next tuesday's 1/28 meeting
=> Dennis is ready to put any layout into elegant to test optics, then we iterate
  • A1/A2 => Reza is wondering about PSS kicker to A1, and A2 being remotely insertable (like A3 or A4)
  • Chopping chamber => fc#1 bellow is leaky, will need to replace this summer (if not sooner), so beam line will be vented...
  • Advanced Booster work => Neil is looking at plan to remove 5D beam line and construct support plates for 4500 lb QCM or Booster

Quick links