(Created page with "We will meet on Wednesday July 16 @ 3pm EST in TL-2221 == For those calling in we'll use the ReadyTalk audio conference system. == 1. Dial Toll-Free Number: 866-740-1260 (U....")
 
 
(10 intermediate revisions by 2 users not shown)
Line 1: Line 1:
We will meet on Wednesday July 16 @ 3pm EST in TL-2221
+
Folks,
 +
 
 +
Let's meet next week, Wednesday July 16 @ 3pm EST in TL-2221.
  
 
== For those calling in we'll use the ReadyTalk audio conference system. ==
 
== For those calling in we'll use the ReadyTalk audio conference system. ==
Line 7: Line 9:
 
== Agenda ==
 
== Agenda ==
  
: Dan - Spring analysis
+
; Spring analysis
 +
: Dan has created a nice summary of our Spring runs (see a recent version in the Mott logbook [https://logbooks.jlab.org/entry/3289631 here]) and has begun analyzing the various studies.  He'll give us an update, showing results from our Cu, Ag, Au "dry run"
 +
 
 +
:[[media:AsymVtt.pdf]]
 +
:[[media:Halfin.pdf]]
 +
:[[media:Halfout.pdf]]
 +
:[[media:Copper.pdf]]
 +
:[[media:Silver.pdf]]
 +
:[[media:Gold.pdf]]
  
: Marty - Model update
+
; Model update
 +
: Last we met, Marty made good progress on reproducing the spectra finding that by more realistic description of the PMT was reproducing energy resolution of ~2.0% as compared to measured ~2.6%.  This was accomplished assuming dE/E ~0.1 %.  I "owed" Marty some info on the realistic spread and it's closer to 50-70 keV in this region, so reasonable range is 0.5-1.0%.  Let's hear about last ~month's progress...
 +
:[[media:MottSimulatedAsym.pdf]]
  
: Joe - Plans for Fall running
+
; Plans for Fall
 +
: Last Spring we successfully recommissioned the Mott to learn it's "new" operating conditions and then collected dry-run data on Au, Ag, Cu.  I'll prepare a summary table or slide, but let's discuss our priorities for Fall running so I can begin lobbying effectively for beam time.
 +
:[[media:140616_FallPlans.pdf]]

Latest revision as of 14:51, 16 July 2014

Folks,

Let's meet next week, Wednesday July 16 @ 3pm EST in TL-2221.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 3441852, followed by “#”

Agenda

Spring analysis
Dan has created a nice summary of our Spring runs (see a recent version in the Mott logbook here) and has begun analyzing the various studies. He'll give us an update, showing results from our Cu, Ag, Au "dry run"
media:AsymVtt.pdf
media:Halfin.pdf
media:Halfout.pdf
media:Copper.pdf
media:Silver.pdf
media:Gold.pdf
Model update
Last we met, Marty made good progress on reproducing the spectra finding that by more realistic description of the PMT was reproducing energy resolution of ~2.0% as compared to measured ~2.6%. This was accomplished assuming dE/E ~0.1 %. I "owed" Marty some info on the realistic spread and it's closer to 50-70 keV in this region, so reasonable range is 0.5-1.0%. Let's hear about last ~month's progress...
media:MottSimulatedAsym.pdf
Plans for Fall
Last Spring we successfully recommissioned the Mott to learn it's "new" operating conditions and then collected dry-run data on Au, Ag, Cu. I'll prepare a summary table or slide, but let's discuss our priorities for Fall running so I can begin lobbying effectively for beam time.
media:140616_FallPlans.pdf