Difference between revisions of "July 19, 2022 - Group meeting"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "July 19 ;General * Tue, Jul 25 -deadline to submit NA-PAC proceedings for internal review * Tue, Aug 2 - deadline to submit NA-PAC proceedings [https://attend.ieee.org/napac-...")
 
Line 1: Line 1:
 
July 19
 
July 19
  
;General
+
;Deadlines
* Tue, Jul 25 -deadline to submit NA-PAC proceedings for internal review
+
* Tue, Jul 25 -deadline to submit NA-PAC proceedings for internal review [[CIS Conference and Workshop Proceedings]]
 
* Tue, Aug 2 - deadline to submit NA-PAC proceedings [https://attend.ieee.org/napac-2022/ NA-PAC]
 
* Tue, Aug 2 - deadline to submit NA-PAC proceedings [https://attend.ieee.org/napac-2022/ NA-PAC]
 
NA-PAC - [http://www.example.com link title]
 
 
* Fri, Aug 19 deadline to submit FY22 PO's
 
* Fri, Aug 19 deadline to submit FY22 PO's
  
;  
+
;General Info
* Travel ready?
+
* I&C
* Proceedings due Aug 2 (4 weeks)
+
* CIS web page
* https://wiki.jlab.org/ciswiki/index.php/CIS_Conference_and_Workshop_Proceedings
+
*  
  
 
; Papers and reports
 
; Papers and reports
 +
* Early scientist lunchtime gatherings
 
* Valeria's - summer study report
 
* Valeria's - summer study report
 
* Matt's PV - graphics from Joe Wien, Marcy Molflow, Riad PV
 
* Matt's PV - graphics from Joe Wien, Marcy Molflow, Riad PV
Line 19: Line 18:
 
* Josh's and Joe's biased anode - author review
 
* Josh's and Joe's biased anode - author review
  
; CEBAF and 200 KV gun
+
; CEBAF
* Riad on-call - Wien SCE 60 Hz ~10% intensity after apertures, Tom says causes RF issues - https://logbooks.jlab.org/entry/4011183
+
* Gun2 lifetime
* Gun2 lifetime getting better - https://logbooks.jlab.org/entry/4011198
+
* A2/IYG0I02 charging
* I&C could not reproduce John's firmware for 4-laser board, assigned engineer use modern comm tools, maybe have to re-write firmware TBD
+
* Hall D TMG
* Riad working with I&C and fast electronics => Moller helicity board (Riad), new helicity decoder board (Riad), helicity magnets upgrade (Joe), RTP helicity HV driver (Shukui)
+
* Hall A laser board
  
; UITF
+
; UITF (next 2-3 weeks)
* this week (Jul 4th) => see if we can wrap up cave work, back to beam permit? [[media:220705_UITF_HCO.docx]]
+
* Yan wants to recheck some booster measurements. deflection, rotation, 2-cell GSet calibration
* next week (Jul 11th) => MeV HCO in AM, then beam for main jobs (beam FC, viewer shields, Wien E/B cal, beam Mott dump, Mott det/DAQ, prebuncher)
+
* Max wants to repeat the measurement of spectral content on beam, for beam to the MeV spectrometer, in CW (I will ask David H. for permission, someone from RadCon will need to be there during data taking)
* following 2 weeks (July 18 - Aug 1) => MeV beam ops (prebuncher, booster, wastewater)
+
* Gigi wants beam
 +
* Tomasz and Rama want time for LLRF3.0 development
 +
* Joe/Riad/Valeria want some time to finish Mott, what amounts to ~finish Mott checkout + ~ 1 shift for tgt. thick & spin dance
  
 
; Your Projects
 
; Your Projects

Revision as of 17:55, 16 July 2022

July 19

Deadlines
General Info
  • I&C
  • CIS web page
Papers and reports
  • Early scientist lunchtime gatherings
  • Valeria's - summer study report
  • Matt's PV - graphics from Joe Wien, Marcy Molflow, Riad PV
  • Sajini's and Mamun's and Riad's magnetized beams - peer review
  • Josh's and Joe's biased anode - author review
CEBAF
  • Gun2 lifetime
  • A2/IYG0I02 charging
  • Hall D TMG
  • Hall A laser board
UITF (next 2-3 weeks)
  • Yan wants to recheck some booster measurements. deflection, rotation, 2-cell GSet calibration
  • Max wants to repeat the measurement of spectral content on beam, for beam to the MeV spectrometer, in CW (I will ask David H. for permission, someone from RadCon will need to be there during data taking)
  • Gigi wants beam
  • Tomasz and Rama want time for LLRF3.0 development
  • Joe/Riad/Valeria want some time to finish Mott, what amounts to ~finish Mott checkout + ~ 1 shift for tgt. thick & spin dance
Your Projects
  • Gabriel 500 kV insulator
  • Marcy mini-Mott
  • Mamun TE011 cavity & vacuum work
  • Riad LDRD
  • Shukui KL laser