June 5, 2019

From Ciswikidb
Revision as of 16:23, 4 June 2019 by Grames (talk | contribs)
Jump to navigation Jump to search

We'll meet in TL-2561a on June 5, 2019 @ 9:30am.

Unusual Circumstances

There have been 3 recent incidents where fire trucks responded to alarms on the accelerator site:

  1. 10A card in a 1A slot resulting in a burned up air core magnet at 0L09
  2. Mis-wired 25A short on 100A shunt resulting in burned insulation on a ZA magnet
  3. Failed transformer winding on 28 year old klystron cathode power supply


What's going on around site?

CEBAF
LERF
  • Cryo is able to support both CEBAF (low energy) and LERF (LCLS + radio-isotope) this summer
  • Can we be ready for next run in ~3 weeks (drive laser + gun) ?
UITF
  • Status of 200kV electrode
  • Status of ARR
GTS
  • TGUN