Difference between revisions of "June 9, 2021 - Group Meeting"
Jump to navigation
Jump to search
(8 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
* new hires | * new hires | ||
* MEDCON4 | * MEDCON4 | ||
+ | # maximize tele-working | ||
+ | # daily self certification remains | ||
+ | # on-site in person meetings allowed | ||
+ | # vaccination reporting encouraged | ||
+ | #face masks required if unvaccinated | ||
* re-"Grouping" | * re-"Grouping" | ||
+ | * Matt... | ||
* power outages (CEBAF, TL, UITF, GTS) - [[media:Building 58 After hour e-call listing June.08.2021 - PJD.docx]] | * power outages (CEBAF, TL, UITF, GTS) - [[media:Building 58 After hour e-call listing June.08.2021 - PJD.docx]] | ||
* Geoff is inquiring if we want another stream of PhD students | * Geoff is inquiring if we want another stream of PhD students | ||
+ | * ...is 9:30's on Wed a good time? | ||
+ | |||
+ | ; Status on on our contribution to Lab projects | ||
+ | * EIC - expected, scope coordination ramping up, for FY22 (and maybe FY21 contribution) | ||
+ | * ILC - solicited, work packages being developed, do we want to contribute? maybe we need to meet/discuss what exactly, resources, timeline | ||
; CEBAF | ; CEBAF | ||
Line 18: | Line 29: | ||
; UITF | ; UITF | ||
+ | * Mike McCaughn work coordinator/facility manager & Safety Warden | ||
* Restoration begins July 26 (~6 weeks) | * Restoration begins July 26 (~6 weeks) | ||
* Clean HV chamber | * Clean HV chamber | ||
Line 27: | Line 39: | ||
* Re-building depo, gun, beam line, laser, HV controls - wow! | * Re-building depo, gun, beam line, laser, HV controls - wow! | ||
* Once built, program til end of year... | * Once built, program til end of year... | ||
+ | |||
+ | ;LERF | ||
+ | * Per Camille, pause on LERF upgrades | ||
+ | * Presently, don't anticipate radio-isotope runs for a ~year-ish? | ||
+ | * I am suggesting we move to the LERF, offices, labs, injector, etc....what do you think of this? | ||
; Students, FOA's, LDRD's, SBIR's ... | ; Students, FOA's, LDRD's, SBIR's ... | ||
Line 33: | Line 50: | ||
* Photocathode & HV FOA's | * Photocathode & HV FOA's | ||
* SBIR's | * SBIR's | ||
− | |||
− | |||
− | |||
− |
Latest revision as of 09:27, 9 June 2021
- Group business
- new hires
- MEDCON4
- maximize tele-working
- daily self certification remains
- on-site in person meetings allowed
- vaccination reporting encouraged
- face masks required if unvaccinated
- re-"Grouping"
- Matt...
- power outages (CEBAF, TL, UITF, GTS) - media:Building 58 After hour e-call listing June.08.2021 - PJD.docx
- Geoff is inquiring if we want another stream of PhD students
- ...is 9:30's on Wed a good time?
- Status on on our contribution to Lab projects
- EIC - expected, scope coordination ramping up, for FY22 (and maybe FY21 contribution)
- ILC - solicited, work packages being developed, do we want to contribute? maybe we need to meet/discuss what exactly, resources, timeline
- CEBAF
- Restoration begins July 16 (~5 weeks)
- Commissioning - I don't see how it all fits, restoring CEBAF for the Fall run would be top priority
- Things maybe left to do?
- PCup - water leak and pig-tail?
- Wien HV - work with injector group to decide mode of operation
- Harp - work with ME group to develop a solution, decide if/when to install
- Mode-locked fiber laser
- Mott target ladder swap
- Phase 2 - who thinks we're ready by January?
- UITF
- Mike McCaughn work coordinator/facility manager & Safety Warden
- Restoration begins July 26 (~6 weeks)
- Clean HV chamber
- New cathode and anode spider (~week?)
- Prep chamber - mask, pucks, Sb source
- Bake (~week) + condition (~week)
- GTS
- Re-building depo, gun, beam line, laser, HV controls - wow!
- Once built, program til end of year...
- LERF
- Per Camille, pause on LERF upgrades
- Presently, don't anticipate radio-isotope runs for a ~year-ish?
- I am suggesting we move to the LERF, offices, labs, injector, etc....what do you think of this?
- Students, FOA's, LDRD's, SBIR's ...
- Students - Sajini, Josh
- LDRD's - Shukui, Joe
- Photocathode & HV FOA's
- SBIR's