Difference between revisions of "MOLLER PQB Meeting March 20, 2024"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "In person in MCC Conference Room and with Zoom. https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam -- '''Agenda:''' 1- '''Two major MOLLER beam studies in Hall A...")
 
 
(7 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
1- '''Two major MOLLER beam studies in Hall A:'''
 
1- '''Two major MOLLER beam studies in Hall A:'''
 
# '''FFB in Hall A:''' (tentatively scheduled on April 17)  
 
# '''FFB in Hall A:''' (tentatively scheduled on April 17)  
## BSList to start Hall A April run with FFB ON - Ryan Bodestein: [[media:HallA_FFB_Test_Planning.pdf]]  [[media:HallA_FFB_Test_Planning.pptx]] [https://tasklists.jlab.org/bslist/tasks/111279]
+
## BSList to start Hall A April run with FFB ON - Ryan Bodestein: [https://tasklists.jlab.org/bslist/tasks/111381]
## BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution [https://tasklists.jlab.org/bslist/tasks/109569]
+
## BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution: [https://tasklists.jlab.org/bslist/tasks/109569]
 
# '''K-Long Beam Loading:''' (tentatively scheduled on May 1)  
 
# '''K-Long Beam Loading:''' (tentatively scheduled on May 1)  
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman [https://tasklists.jlab.org/bslist/tasks/111261]
+
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [https://tasklists.jlab.org/bslist/tasks/111261]
## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi
+
## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [https://tasklists.jlab.org/bslist/tasks/111367]
 +
## '''Other issues to look for:'''
 +
### 4-channel BPMs saturation in West Arc
 +
### Dumping beam harmonics right onto one of the higher order mode frequencies
 +
 
 +
2- Fix Hall D Tune-Mode-Generator; it has low extinction ratio

Latest revision as of 14:55, 20 March 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Two major MOLLER beam studies in Hall A:

  1. FFB in Hall A: (tentatively scheduled on April 17)
    1. BSList to start Hall A April run with FFB ON - Ryan Bodestein: [1]
    2. BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution: [2]
  2. K-Long Beam Loading: (tentatively scheduled on May 1)
    1. BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [3]
    2. BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [4]
    3. Other issues to look for:
      1. 4-channel BPMs saturation in West Arc
      2. Dumping beam harmonics right onto one of the higher order mode frequencies

2- Fix Hall D Tune-Mode-Generator; it has low extinction ratio