(Created page with "==Agenda== ; Halfway through FY23 .... how do we spend an average 40 hour week... * Joe - 50% MGT, 25% RSR, 25% R&D * Carlos - 50% RSR, 50% R&D * Riad - 50% RSR, 50% R&D * Sh...")
 
Line 10: Line 10:
 
* Bubba - 50% RSR, 50% R&D
 
* Bubba - 50% RSR, 50% R&D
 
* Gabriel - 100% R&D
 
* Gabriel - 100% R&D
 +
 +
; Transition staffing...
 +
* Posting for electrical/electronics tech at HR, post soon
 +
* Requests for ~50% EE, laser/optics expert, HV/modeler expert
 +
* Post-docs for vacuum and e+ are posted
  
 
; CEBAF is our top priority...
 
; CEBAF is our top priority...
 
* SAD Jobs (Mott ladder, restore lasers/systems, bleed through beam studies, ?)
 
* SAD Jobs (Mott ladder, restore lasers/systems, bleed through beam studies, ?)
* Next run period (June through March)
+
* Next run period (on-call, June through March)
 
* Injector upgrade (200 KV gun, building Phase 2, installing in ~3 months!)
 
* Injector upgrade (200 KV gun, building Phase 2, installing in ~3 months!)
 
* Future experiments (Moller photocathodes/RTP cell/4-channel IA and KL Laser ~0.4pC@~10 MHz)
 
* Future experiments (Moller photocathodes/RTP cell/4-channel IA and KL Laser ~0.4pC@~10 MHz)

Revision as of 08:59, 22 March 2022

Agenda

Halfway through FY23 .... how do we spend an average 40 hour week...
  • Joe - 50% MGT, 25% RSR, 25% R&D
  • Carlos - 50% RSR, 50% R&D
  • Riad - 50% RSR, 50% R&D
  • Shukui - 35% RSR, 65% R&D
  • Marcy - 40% RSR, 20% EIC, 20% R&D
  • Mamun - 25% RSR, 75% R&D
  • Phil - 100% RSR
  • Bubba - 50% RSR, 50% R&D
  • Gabriel - 100% R&D
Transition staffing...
  • Posting for electrical/electronics tech at HR, post soon
  • Requests for ~50% EE, laser/optics expert, HV/modeler expert
  • Post-docs for vacuum and e+ are posted
CEBAF is our top priority...
  • SAD Jobs (Mott ladder, restore lasers/systems, bleed through beam studies, ?)
  • Next run period (on-call, June through March)
  • Injector upgrade (200 KV gun, building Phase 2, installing in ~3 months!)
  • Future experiments (Moller photocathodes/RTP cell/4-channel IA and KL Laser ~0.4pC@~10 MHz)
Projects wrapping up...
  • Magnetized beams (Apr)
  • Robust (Jun-Sep)
  • Compton (Aug-Oct)
  • MOCVD (Sep)
  • CBE (Sep)
  • HVINS (Sep?)
  • AI/ML (Sep, 2023)
  • Shukui's LDRD (Sep, 2023)
Proposals that would start Sep 2022
  • 1mA PGun for LERF (occupies GTS)
  • DBR (~4 weeks/year @ CEBAF)
  • MBE (~? weeks/year in TL-1137, needs working miniMott)
  • EDM (~? weeks/year of Riad)