Line 9: Line 9:
 
**'''4 weeks (Apr 5 - Apr 30)''' are allocated for girder hook-ups + HCO/System readiness for everything up to FC#2
 
**'''4 weeks (Apr 5 - Apr 30)''' are allocated for girder hook-ups + HCO/System readiness for everything up to FC#2
  
*Preliminary Songsheet
+
*Beam line layout
** Updated as of '''Feb 23''' on the upgrade home page => [[CEBAF Injector Upgrade]]
+
** Preliminary ME songsheet released, up to date as of '''Feb 23''' on the upgrade home page => [[CEBAF Injector Upgrade]]
 
+
** 3D CAD model exists if you want to see something not there now
* What to expect in tunnel?
+
** Cables: Like before trays (above & on girder) + 3 cable bundle drops (near Y, Laser, Chopper)
** Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
 
** There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
 
** Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable trays (above & on girder) + 3 cable bundle drops (Y, Laser, Chopper)
 
  
 
; DC/Magnet Jobs
 
; DC/Magnet Jobs

Latest revision as of 14:53, 1 March 2021

Meeting Info =

We will kick-off the Phase 1 magnet installation following Steve's Monday at 1330 SAD discussion. https://bluejeans.com/569476853

Agenda

Installation status
  • Schedule
    • Transition from vac/mech to girder hook-ups planned to begin April 5 (5 weeks from today) - maybe 1 or 2 weeks earlier
    • 4 weeks (Apr 5 - Apr 30) are allocated for girder hook-ups + HCO/System readiness for everything up to FC#2
  • Beam line layout
    • Preliminary ME songsheet released, up to date as of Feb 23 on the upgrade home page => CEBAF Injector Upgrade
    • 3D CAD model exists if you want to see something not there now
    • Cables: Like before trays (above & on girder) + 3 cable bundle drops (near Y, Laser, Chopper)
DC/Magnet Jobs
Software Jobs
  • CED
  • Apps
  • Screens
  • What else for software?
Other magnet jobs
  • Done (JM) Complete magnet table I circulated
  • (JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
  • (RS/GC) FG solenoid special hysteresis for Gary
  • (RS/MJ) Magnet info for Inj Steer spin calculations
  • (JM/JG) Decision on spare DR fabrication and alignment
  • (LL/JK/JM) PSS kicker - does MMF have any responsibility here, maybe just PSS?
  • (LL/JM) Second QW measurement, what's the scope here?
  • (JM) When is the rotating coil stand ready?
  • (JM/LL) Reconciling MHD discrepancy
  • (LL) Report on QW
  • (LL) Report on HD
  • (LL) Report on PSS kicker
CIS Magnet Jobs
Plans