March 20, 2020 - ME/INJ/CIS

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Meeting Info

Friday 3/20 @ 10am by bluejeans: https://jlab.bluejeans.com/553225778

On-Going Jobs

Let's work through our 'jobs' and see what work can be done at home, what cannot
Today's work plan file media:200320_AIPINJ_Workplan.xlsx
ME jobs
  • what's the capability to work on the layout at home? and to distribute updated of models to look at? or dimensioned beamlines to use?
  • what's the list of ME tasks (design, fabrication, orders)
MAG jobs
  • PSS kicker
  • DS dipole
CIS jobs
INJ/CASA jobs
  • help finalize final layout
  • evaluate layout w/ simulations to list operational settings (solenoids, quads, prebuncher), Wien's off and on
    • Spreadsheet with quad and solenoid settings for various Wien configurations, from elegant:

media:magnet_setpoints.ods

Last Meeting's Punchlist

ME
  • Danny - Will Frank Marhauser model the BPM design? => Frank said he checked this, the BPM is quite similar to previous ones that I have modelled based on given designs
  • Alicia - Show a Haimson corrector on spool downstream of first solenoid => done
  • Joe - Please show UITF style camera assembly on viewer crosses => done
  • Joe - Do we need a different length spool piece through the two FG solenoids than exists today? =>
  • Matt - we probably need a new A1 cube (prior one modified for Brock bunchlength monitor) => reqs for new cubes
  • Alicia - please swap harp w/ valve on last girder before chopper => done
  • Reza - please put A2 on a cube as well, w/ same type of steering coils => done
  • Danny - Does A1 full retract? => Bottom edge of A1 nominal 0.475" (12mm) out of beam line media:200320_Aperture1.pdf
INJ/CASA
  • Joe - do you need 200 keV beam for any final checkout tests before we take beam line apart? =>
  • Joe - is the distance from MFG-A to upstream steering coil sufficient? =>
  • Matt - decide what power you need in different cavities/locations, work w/ RF to determine regulation needed =>
  • Riad - will magnetic field of first coil reach photocathode? will it affect solenoids? => Field map: media:BH_Haimson_Coils.xlsx
  • Joe - do we have all ion pumps and valves per model? => Marcy's first pass, but needs to see model again media:200320_ion pumps and valves.pptx
CIS
  • Matt - Lubricate the stepper motors => added to summer work plans
  • Matt - Order spare right angle values => ordered +2 in addition to existing 5 in tunnel
  • Matt - Update on Brock pre-buncher delivery plan => parts due to Jlab by early April, (many fab/testing steps, so probably delays)
  • Joe - What's dependence of spacing FG's closer? => Jay ran the models for 4 or 5 spacings