Difference between revisions of "March 31, 2017 - 200kV gun upgrade meeting"
Jump to navigation
Jump to search
(Created page with "== New action items == ===Electrode/insulator design/fabrication=== *Danny/Gabriel/Carlos will iterate on final design : minimize gap over triple point, optimize ceramic/meta...") |
|||
Line 2: | Line 2: | ||
===Electrode/insulator design/fabrication=== | ===Electrode/insulator design/fabrication=== | ||
− | * | + | * Fields to vacuum chamber |
− | + | * Modify shed radius | |
− | + | * Final ME design | |
− | * | + | * Internal parts |
− | + | *Plan is to vacuum fire electrode 900C, barrel polish before attaching to ceramic | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Vacuum chamber/considerations=== | ===Vacuum chamber/considerations=== | ||
− | * | + | * Use as-is, but identify/repair short of NEG isolation, retain leak valve but add right angle for isolation. Do we forego NEG isolation and remove unnecessary ceramic plates (fallen to bottom of chamber) |
− | |||
− | |||
− | |||
− | |||
===Gun2 NEG Tube=== | ===Gun2 NEG Tube=== | ||
− | * | + | * BPM discussion w/ Musson happened last Monday |
+ | ** Plan A : | ||
+ | ** Plan B : Consider using more wires to measure position and moments a.k.a. spot size | ||
+ | * Re-use Gun3 NEG solenoid | ||
+ | * Met in tunnel to develop first pass ME design | ||
[https://logbooks.jlab.org/entry/3468102 Logbook pic/layout of the existing Gun2 NEG] | [https://logbooks.jlab.org/entry/3468102 Logbook pic/layout of the existing Gun2 NEG] | ||
− | |||
− | |||
− | |||
===Gun3 Removal=== | ===Gun3 Removal=== | ||
− | * | + | * Matt check with Willeke next week for Gun3 |
− | + | * Marcy submitted [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/17278 ATLIS task] for the job | |
+ | * Remove Gun3 table, rebuild 8" chamber w/ extractor, RGA, GP-100 on 80/20 stand | ||
+ | * Recoup Gun3 MFH solenoid | ||
+ | * Planning for May | ||
+ | |||
+ | === Eliminating Gun Switch software Gun3 === | ||
− | |||
− | |||
===Spellman HVPS update=== | ===Spellman HVPS update=== | ||
− | + | * Mike Johnson has been working on Laser Frequency Divider | |
− | + | * Time to get him started on Spellman at UITF? | |
+ | |||
===Radmon update=== | ===Radmon update=== |
Revision as of 12:18, 30 March 2017
New action items
Electrode/insulator design/fabrication
- Fields to vacuum chamber
- Modify shed radius
- Final ME design
- Internal parts
- Plan is to vacuum fire electrode 900C, barrel polish before attaching to ceramic
Vacuum chamber/considerations
- Use as-is, but identify/repair short of NEG isolation, retain leak valve but add right angle for isolation. Do we forego NEG isolation and remove unnecessary ceramic plates (fallen to bottom of chamber)
Gun2 NEG Tube
- BPM discussion w/ Musson happened last Monday
- Plan A :
- Plan B : Consider using more wires to measure position and moments a.k.a. spot size
- Re-use Gun3 NEG solenoid
- Met in tunnel to develop first pass ME design
Logbook pic/layout of the existing Gun2 NEG
Gun3 Removal
- Matt check with Willeke next week for Gun3
- Marcy submitted ATLIS task for the job
- Remove Gun3 table, rebuild 8" chamber w/ extractor, RGA, GP-100 on 80/20 stand
- Recoup Gun3 MFH solenoid
- Planning for May
Eliminating Gun Switch software Gun3
Spellman HVPS update
- Mike Johnson has been working on Laser Frequency Divider
- Time to get him started on Spellman at UITF?