Difference between revisions of "March 31, 2017 - 200kV gun upgrade meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 7: Line 7:
 
* Then ... vacuum fire electrode 900C, barrel polish, assemble to insulator
 
* Then ... vacuum fire electrode 900C, barrel polish, assemble to insulator
 
* Status of parts
 
* Status of parts
 +
Ceramic bushing holder ready from shop [[media:170330_bushing.pdf]]
 +
Ordered two centering ceramics - 4-6 weeks
  
 
===Vacuum chamber/considerations===
 
===Vacuum chamber/considerations===
Line 15: Line 17:
 
===Gun2 NEG Tube===
 
===Gun2 NEG Tube===
 
* BPM discussion w/ Musson occurred on Monday, considerations:
 
* BPM discussion w/ Musson occurred on Monday, considerations:
** Antenna : stripline or wire (mini or weld) [[media:170327_stripline.pdf]]
+
Antenna : stripline or wire (mini or weld) [[media:170327_stripline.pdf]]
** Position and orientation of antenna v. can for transmission line, length of antenna v. energy
+
Position and orientation of antenna v. can for transmission line, length of antenna v. energy
** NEG coat surfaces of pipe, not can? TBD
+
NEG coat surfaces of pipe, not can? TBD
** Re-use Gun3 NEG solenoid
 
 
* Met in tunnel to develop first pass ME design [https://logbooks.jlab.org/entry/3468102 Logbook pic/layout of the existing Gun2 NEG]
 
* Met in tunnel to develop first pass ME design [https://logbooks.jlab.org/entry/3468102 Logbook pic/layout of the existing Gun2 NEG]
** First iteration [[media:NEGTUBE_MARCH30.pdf]]
+
First iteration [[media:NEGTUBE_MARCH30.pdf]]
  
 
===Gun3 Removal===
 
===Gun3 Removal===
* Matt check with Willeke next week for Gun3
+
* Matt check with Willeke next week during JLEIC meeting Gun3
* Marcy submitted [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/17278 ATLIS task] for the job
+
* Remove Gun3 table, rebuild 8" chamber w/ extractor, RGA, GP-100 on 80/20 stand, recoup Gun3 MFH solenoid
* Remove Gun3 table, rebuild 8" chamber w/ extractor, RGA, GP-100 on 80/20 stand
+
Planning for May - Marcy submitted [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/17278 ATLIS task] for the job
* Recoup Gun3 MFH solenoid
 
* Planning for May
 
  
 
=== Eliminating Gun Switch Software ===
 
=== Eliminating Gun Switch Software ===
  
 
===Spellman HVPS update===
 
===Spellman HVPS update===
* Mike Johnson has been working on Laser Frequency Divider
+
* Time to get Mike Johnson started on Spellman at UITF?
* Time to get him started on Spellman at UITF?
+
John/Brad trying to communicate to Spellman w/ their software
 +
Need old version of JAVA to get started
  
 
===Radmon update===
 
===Radmon update===

Revision as of 06:20, 31 March 2017

New action items

Electrode/insulator design/fabrication

  • Gabriel assessed fields to vacuum chamber, modified shed radius
  • S&A insulator measurements
  • ME design for shop ... goal was end of March !!!
  • Then ... vacuum fire electrode 900C, barrel polish, assemble to insulator
  • Status of parts
Ceramic bushing holder ready from shop media:170330_bushing.pdf
Ordered two centering ceramics - 4-6 weeks

Vacuum chamber/considerations

  • Retain leak valve, add right angle valve through first bake, at least
  • Retain electrical isolation and NEG activation at 100C
  • Pick up ceramics, blow out NEG

Gun2 NEG Tube

  • BPM discussion w/ Musson occurred on Monday, considerations:
Antenna : stripline or wire (mini or weld) media:170327_stripline.pdf
Position and orientation of antenna v. can for transmission line, length of antenna v. energy
NEG coat surfaces of pipe, not can? TBD
First iteration media:NEGTUBE_MARCH30.pdf

Gun3 Removal

  • Matt check with Willeke next week during JLEIC meeting Gun3
  • Remove Gun3 table, rebuild 8" chamber w/ extractor, RGA, GP-100 on 80/20 stand, recoup Gun3 MFH solenoid
Planning for May - Marcy submitted ATLIS task for the job

Eliminating Gun Switch Software

Spellman HVPS update

  • Time to get Mike Johnson started on Spellman at UITF?
John/Brad trying to communicate to Spellman w/ their software
Need old version of JAVA to get started

Radmon update