New action items

Electrode/insulator design/fabrication

  • Gabriel assessed fields to vacuum chamber, modified shed radius
  • S&A insulator measurements
  • ME design for shop ... goal was end of March !!!
  • Then ... vacuum fire electrode 900C, barrel polish, assemble to insulator
  • Status of parts
Ceramic bushing holder ready from shop media:170330_bushing.pdf
Ordered two centering ceramics - 4-6 weeks

Vacuum chamber/considerations

  • Retain leak valve, add right angle valve through first bake, at least
  • Retain electrical isolation and NEG activation at 100C
  • Pick up ceramics, blow out NEG

Gun2 NEG Tube

  • BPM discussion w/ Musson occurred on Monday, considerations:
Antenna : stripline or wire (mini or weld) media:170327_stripline.pdf
Position and orientation of antenna v. can for transmission line, length of antenna v. energy
NEG coat surfaces of pipe, not can? TBD
First iteration media:NEGTUBE_MARCH30.pdf

Gun3 Removal

  • Matt check with Willeke next week during JLEIC meeting Gun3
  • Remove Gun3 table, rebuild 8" chamber w/ extractor, RGA, GP-100 on 80/20 stand, recoup Gun3 MFH solenoid
Planning for May - Marcy submitted ATLIS task for the job

Eliminating Gun Switch Software

Spellman HVPS update

  • Time to get Mike Johnson started on Spellman at UITF?
John/Brad trying to communicate to Spellman w/ their software
Need old version of JAVA to get started

Radmon update