Difference between revisions of "March 6, 2013"

From Ciswikidb
Jump to navigation Jump to search
 
Line 10: Line 10:
  
 
  Joe:
 
  Joe:
Add (T,U) calculation to JLAB code and compare w/ Xavier
 
 
  Work w/ ME to identify target configuration (manip + coupling + ladder + holder + foil)
 
  Work w/ ME to identify target configuration (manip + coupling + ladder + holder + foil)
 +
Work w/ SA to identify how collimator/target were aligned in ~2000
 +
[[Media:130306_Chamber_Geometry.pdf]]
 
  First simulations of dump w/ graphite plate
 
  First simulations of dump w/ graphite plate
  Work w/ SA to identify how collimator/target were aligned in ~2000
+
  Add (T,U) calculation to JLAB code and compare w/ Xavier
  
 
  Marty:
 
  Marty:

Latest revision as of 15:40, 6 March 2013

We will meet in CEBAF Center Rm. F226 on Wednesday March 6 at 3pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 3441852, followed by “#”

Agenda

Here are outstanding 'To Do' topics from last meeting:

Joe:
Work w/ ME to identify target configuration (manip + coupling + ladder + holder + foil)
Work w/ SA to identify how collimator/target were aligned in ~2000
Media:130306_Chamber_Geometry.pdf
First simulations of dump w/ graphite plate
Add (T,U) calculation to JLAB code and compare w/ Xavier
Marty:
Generate TOF plots vs. Au target thickness from June data
Explore energy shape of elastics from prompt (target) or delayed (dump) e's
Complete G4 detector geometry, test w/ ideal (3,5,8) MeV e-
Riad:
Learn about G4 physics model that includes Mott scattering
Charlie: 
Discuss Mott graphite options w/ Dave Meekins
Advise power spectrum/suitable camera for OTR collection