(Created page with "===Past Week=== :Bubble experiment ::Added new harp w/ temporary controls, HCO OK ::Restored radiator isolation w/ ceramic w/ shield aimed downstream, in series w/ FCUP, HCO O...") |
|||
Line 2: | Line 2: | ||
:Bubble experiment | :Bubble experiment | ||
::Added new harp w/ temporary controls, HCO OK | ::Added new harp w/ temporary controls, HCO OK | ||
− | ::Restored radiator isolation w/ ceramic | + | ::Restored radiator isolation w/ ceramic (shield aimed downstream), in series w/ FCUP, HCO OK |
::Added Gumby (10 sec) laser shutter, tested w/ Beam OK, can now enable/disable from control room | ::Added Gumby (10 sec) laser shutter, tested w/ Beam OK, can now enable/disable from control room | ||
+ | ::Restored x-ray card to set beam position at radiator | ||
+ | ::Background looking OK ~0.01 Hz | ||
===Next Week and Beyond=== | ===Next Week and Beyond=== |
Revision as of 19:03, 10 May 2018
Past Week
- Bubble experiment
- Added new harp w/ temporary controls, HCO OK
- Restored radiator isolation w/ ceramic (shield aimed downstream), in series w/ FCUP, HCO OK
- Added Gumby (10 sec) laser shutter, tested w/ Beam OK, can now enable/disable from control room
- Restored x-ray card to set beam position at radiator
- Background looking OK ~0.01 Hz