::Restored x-ray card to set beam position at radiator
 
::Restored x-ray card to set beam position at radiator
 
::Background looking OK ~0.01 Hz
 
::Background looking OK ~0.01 Hz
 +
:Upgrade Preparations
 +
::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
 +
::DecaRad unit installed below outrigger laser table, heads/cables ready, ready soon
  
 
===Next Week and Beyond===
 
===Next Week and Beyond===

Revision as of 19:05, 10 May 2018

Past Week

Bubble experiment
Added new harp w/ temporary controls, HCO OK
Restored radiator isolation w/ ceramic (shield aimed downstream), in series w/ FCUP, HCO OK
Added Gumby (10 sec) laser shutter, tested w/ Beam OK, can now enable/disable from control room
Restored x-ray card to set beam position at radiator
Background looking OK ~0.01 Hz
Upgrade Preparations
Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
DecaRad unit installed below outrigger laser table, heads/cables ready, ready soon