Difference between revisions of "May 11, 2018 - SAD Toolbox Meeting"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
===Past Week=== | ===Past Week=== | ||
− | :Bubble | + | :Bubble Run |
− | ::Added new harp w/ temporary controls | + | ::Added new harp w/ temporary controls |
− | :: | + | ::Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP |
− | ::Added Gumby (10 sec) laser shutter, tested w/ | + | ::Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable |
− | :: | + | ::Added x-ray card to locate beam position |
− | |||
:Upgrade Preparations | :Upgrade Preparations | ||
+ | ::Tested HVPS to 300kV in SF6 tanks at 15psi, and greater | ||
::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA | ::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA | ||
− | ::DecaRad | + | ::DecaRad installation below outrigger laser table started, heads/cables ready to dress |
+ | ::PSS dipole measurements vs. expected gun voltage | ||
===Next Week and Beyond=== | ===Next Week and Beyond=== | ||
+ | :Bubble will continue to run until next Friday @ 8am | ||
+ | :Met w/ Jerry to review PSS integration plans |
Revision as of 19:21, 10 May 2018
Past Week
- Bubble Run
- Added new harp w/ temporary controls
- Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
- Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
- Added x-ray card to locate beam position
- Upgrade Preparations
- Tested HVPS to 300kV in SF6 tanks at 15psi, and greater
- Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
- DecaRad installation below outrigger laser table started, heads/cables ready to dress
- PSS dipole measurements vs. expected gun voltage
Next Week and Beyond
- Bubble will continue to run until next Friday @ 8am
- Met w/ Jerry to review PSS integration plans