Difference between revisions of "May 11, 2018 - SAD Toolbox Meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
===This Last Week-ish===
 
===This Last Week-ish===
:Bubble Run
+
:'''Bubble Run'''
 
::Added new harp w/ temporary controls
 
::Added new harp w/ temporary controls
 
::Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
 
::Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
 
::Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
 
::Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
 
::Added x-ray card to locate beam position
 
::Added x-ray card to locate beam position
:Upgrade Preparations
+
:'''Upgrade Preparations'''
 
::Tested HVPS to 300kV in SF6 tanks at 15psi, and greater
 
::Tested HVPS to 300kV in SF6 tanks at 15psi, and greater
 
::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
 
::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA

Revision as of 20:35, 10 May 2018

This Last Week-ish

Bubble Run
Added new harp w/ temporary controls
Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
Added x-ray card to locate beam position
Upgrade Preparations
Tested HVPS to 300kV in SF6 tanks at 15psi, and greater
Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
DecaRad installation below outrigger laser table started, heads/cables ready to dress
S&A begin 200kV electrode measurements 5/11 (per last week's plan)
PSS dipole measurements vs. expected gun voltage

Next Week and Beyond

Bubble will continue to run until next Friday @ 8am
Met w/ Jerry to review PSS integration plans media:SAD18_Upgrade.xlsx
Upgrade Week 1 media:SAD_180510.docx