Difference between revisions of "May 11, 2018 - SAD Toolbox Meeting"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "===Past Week=== :Bubble experiment ::Added new harp w/ temporary controls, HCO OK ::Restored radiator isolation w/ ceramic w/ shield aimed downstream, in series w/ FCUP, HCO O...")
 
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
===Past Week===
+
===Last Week-ish===
:Bubble experiment
+
:'''Bubble Run'''
::Added new harp w/ temporary controls, HCO OK
+
::Added new harp w/ temporary controls
::Restored radiator isolation w/ ceramic w/ shield aimed downstream, in series w/ FCUP, HCO OK
+
::Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
::Added Gumby (10 sec) laser shutter, tested w/ Beam OK, can now enable/disable from control room
+
::Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
 +
::Added x-ray card to locate beam position
 +
:'''Upgrade Preparations'''
 +
::[https://logbooks.jlab.org/entry/3574117 Tested HVPS to 300kV in SF6 tank] at 15psi
 +
::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
 +
::DecaRad installation below outrigger laser table started, heads/cables ready to dress
  
===Next Week and Beyond===
+
===Today, Next Week and Beyond===
 +
:Bubble will continue to run until next Friday @ 8am
 +
:S&A begin 200kV electrode measurements 5/11 (per last week's plan)
 +
:Met w/ Jerry to review PSS integration plans [[media:SAD18_PSS_180511.xlsx]]
 +
::PSS dipole measurements vs. expected gun voltage
 +
:Upgrade Week #1 (May 21-25) [[media:SAD_180510.docx]]

Latest revision as of 10:51, 11 May 2018

Last Week-ish

Bubble Run
Added new harp w/ temporary controls
Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
Added x-ray card to locate beam position
Upgrade Preparations
Tested HVPS to 300kV in SF6 tank at 15psi
Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
DecaRad installation below outrigger laser table started, heads/cables ready to dress

Today, Next Week and Beyond

Bubble will continue to run until next Friday @ 8am
S&A begin 200kV electrode measurements 5/11 (per last week's plan)
Met w/ Jerry to review PSS integration plans media:SAD18_PSS_180511.xlsx
PSS dipole measurements vs. expected gun voltage
Upgrade Week #1 (May 21-25) media:SAD_180510.docx