Line 15: Line 15:
 
:Bubble will continue to run until next Friday @ 8am
 
:Bubble will continue to run until next Friday @ 8am
 
:Met w/ Jerry to review PSS integration plans [[media:SAD18_Upgrade.xlsx]]
 
:Met w/ Jerry to review PSS integration plans [[media:SAD18_Upgrade.xlsx]]
 +
:Upgrade Week #1 (May 21st...)
 +
::Monday
 +
:::Record laser retroreflection
 +
:::Secure area for work (HV, vacuum

Revision as of 19:55, 10 May 2018

This Last Week-ish

Bubble Run
Added new harp w/ temporary controls
Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
Added x-ray card to locate beam position
Upgrade Preparations
Tested HVPS to 300kV in SF6 tanks at 15psi, and greater
Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
DecaRad installation below outrigger laser table started, heads/cables ready to dress
S&A begin 200kV electrode measurements 5/11 (per last week's plan)
PSS dipole measurements vs. expected gun voltage

Next Week and Beyond

Bubble will continue to run until next Friday @ 8am
Met w/ Jerry to review PSS integration plans media:SAD18_Upgrade.xlsx
Upgrade Week #1 (May 21st...)
Monday
Record laser retroreflection
Secure area for work (HV, vacuum