Difference between revisions of "May 11, 2018 - SAD Toolbox Meeting"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
::Restored x-ray card to set beam position at radiator | ::Restored x-ray card to set beam position at radiator | ||
::Background looking OK ~0.01 Hz | ::Background looking OK ~0.01 Hz | ||
+ | :Upgrade Preparations | ||
+ | ::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA | ||
+ | ::DecaRad unit installed below outrigger laser table, heads/cables ready, ready soon | ||
===Next Week and Beyond=== | ===Next Week and Beyond=== |
Revision as of 19:05, 10 May 2018
Past Week
- Bubble experiment
- Added new harp w/ temporary controls, HCO OK
- Restored radiator isolation w/ ceramic (shield aimed downstream), in series w/ FCUP, HCO OK
- Added Gumby (10 sec) laser shutter, tested w/ Beam OK, can now enable/disable from control room
- Restored x-ray card to set beam position at radiator
- Background looking OK ~0.01 Hz
- Upgrade Preparations
- Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
- DecaRad unit installed below outrigger laser table, heads/cables ready, ready soon