Difference between revisions of "May 11, 2018 - SAD Toolbox Meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
===Past Week===
 
===Past Week===
:Bubble experiment
+
:Bubble Run
::Added new harp w/ temporary controls, HCO OK
+
::Added new harp w/ temporary controls
::Restored radiator isolation w/ ceramic (shield aimed downstream), in series w/ FCUP, HCO OK
+
::Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
::Added Gumby (10 sec) laser shutter, tested w/ Beam OK, can now enable/disable from control room
+
::Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
::Restored x-ray card to set beam position at radiator
+
::Added x-ray card to locate beam position
::Background looking OK ~0.01 Hz
 
 
:Upgrade Preparations
 
:Upgrade Preparations
 +
::Tested HVPS to 300kV in SF6 tanks at 15psi, and greater
 
::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
 
::Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
::DecaRad unit installed below outrigger laser table, heads/cables ready, ready soon
+
::DecaRad installation below outrigger laser table started, heads/cables ready to dress
 +
::PSS dipole measurements vs. expected gun voltage
  
 
===Next Week and Beyond===
 
===Next Week and Beyond===
 +
:Bubble will continue to run until next Friday @ 8am
 +
:Met w/ Jerry to review PSS integration plans

Revision as of 19:21, 10 May 2018

Past Week

Bubble Run
Added new harp w/ temporary controls
Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
Added x-ray card to locate beam position
Upgrade Preparations
Tested HVPS to 300kV in SF6 tanks at 15psi, and greater
Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
DecaRad installation below outrigger laser table started, heads/cables ready to dress
PSS dipole measurements vs. expected gun voltage

Next Week and Beyond

Bubble will continue to run until next Friday @ 8am
Met w/ Jerry to review PSS integration plans