May 11, 2018 - SAD Toolbox Meeting

From Ciswikidb
Revision as of 19:21, 10 May 2018 by Grames (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Past Week

Bubble Run
Added new harp w/ temporary controls
Added ceramic break to radiator (shield aimed downstream), in series w/ FCUP
Added Gumby (10 sec) laser shutter, tested w/ beam and remote enable/disable
Added x-ray card to locate beam position
Upgrade Preparations
Tested HVPS to 300kV in SF6 tanks at 15psi, and greater
Suitcase added to Tee, bake ~48 hours up to 165C, Tee vacuum good <100's nA
DecaRad installation below outrigger laser table started, heads/cables ready to dress
PSS dipole measurements vs. expected gun voltage

Next Week and Beyond

Bubble will continue to run until next Friday @ 8am
Met w/ Jerry to review PSS integration plans