Difference between revisions of "May 13, 2016 - Mott Group Meeting"

From Ciswikidb
Jump to navigation Jump to search
 
Line 9: Line 9:
 
* Status on electron beam measurements for Runs I and II
 
* Status on electron beam measurements for Runs I and II
 
** Run2 Rates vs Beam Energy and Run1 Predicted Beam Energy [[media:160513_Moser.pdf]]
 
** Run2 Rates vs Beam Energy and Run1 Predicted Beam Energy [[media:160513_Moser.pdf]]
 +
** Beam Energy Status [[media:160513_MottEnergyStatus.pptx]]
 
* Important future dates (SPIN 2016, Marty's defense, self-imposed deadline to submit Phys. Rev. C)
 
* Important future dates (SPIN 2016, Marty's defense, self-imposed deadline to submit Phys. Rev. C)
  

Latest revision as of 09:24, 13 May 2016

We will meet Friday, May 13 at Noon EST in TL-2236.

Updates

Analysis Plan Sequence

  1. (Joe) - finalize polarimeter geometry and detector acceptance.
  2. (Joe, Riad) finalize dipole map and compute beam momentum for Runs I/II
  3. (Xavi) Calculate the final tables of S(E,q,DE,Dq) needed for the simulation and analysis results.
  4. (Marty) Document Geant4 Mott package, cross-train, implement Xavi's tables for final simulation, provide tech-support
  5. (Tim, Marcy, Dan) Complete experimental asymmetry vs. target thickness for Runs I/II; summarize S_effective vs. thickness for Run I/II
  6. (Daniel) Revisit asymmetry vs. energy results
  7. (Daniel, Riad) Rate analysis for Runs I/II

Blue Jeans and Wiki

Toll Free Phone number: 1-888-240-2560
Int'l Call Phone numbers: http://bluejeans.com/numbers
Meeting ID: 618889275#
Web connection for desktop sharing: https://bluejeans.com/618889275
Wiki: https://wiki.jlab.org/ciswiki/index.php/May_13,_2016_-_Mott_Group_Meeting