May 13, 2016 - Mott Group Meeting

From Ciswikidb
Revision as of 09:24, 13 May 2016 by Grames (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

We will meet Friday, May 13 at Noon EST in TL-2236.

Updates

Analysis Plan Sequence

  1. (Joe) - finalize polarimeter geometry and detector acceptance.
  2. (Joe, Riad) finalize dipole map and compute beam momentum for Runs I/II
  3. (Xavi) Calculate the final tables of S(E,q,DE,Dq) needed for the simulation and analysis results.
  4. (Marty) Document Geant4 Mott package, cross-train, implement Xavi's tables for final simulation, provide tech-support
  5. (Tim, Marcy, Dan) Complete experimental asymmetry vs. target thickness for Runs I/II; summarize S_effective vs. thickness for Run I/II
  6. (Daniel) Revisit asymmetry vs. energy results
  7. (Daniel, Riad) Rate analysis for Runs I/II

Blue Jeans and Wiki

Toll Free Phone number: 1-888-240-2560
Int'l Call Phone numbers: http://bluejeans.com/numbers
Meeting ID: 618889275#
Web connection for desktop sharing: https://bluejeans.com/618889275
Wiki: https://wiki.jlab.org/ciswiki/index.php/May_13,_2016_-_Mott_Group_Meeting