Difference between revisions of "May 17, 2022 - updates"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "'''Updates''' # Anode flange designed based on Injector Phase 1 but with two HV ports #* The used zero length reducer 10" to 4-1/2" flanges from the GTS that looks it has a be...")
 
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
 
# Anode flange designed based on Injector Phase 1 but with two HV ports
 
# Anode flange designed based on Injector Phase 1 but with two HV ports
 
#* The used zero length reducer 10" to 4-1/2" flanges from the GTS that looks it has a been baked many times has been machined and is ready for welding the two tubes for the mini-CF HV feedthroughs
 
#* The used zero length reducer 10" to 4-1/2" flanges from the GTS that looks it has a been baked many times has been machined and is ready for welding the two tubes for the mini-CF HV feedthroughs
 
 
# Screen Design
 
# Screen Design
 
#*Bubba made screen sections based on Shaun's drawings from thin and thick wire mesh
 
#*Bubba made screen sections based on Shaun's drawings from thin and thick wire mesh
 
#*Marcy and Carlos looked at the screen sections fit inside the HV chamber, Carlos to talk to Bubba for making new screen sections. Goal is to finish this job by the end of this week.
 
#*Marcy and Carlos looked at the screen sections fit inside the HV chamber, Carlos to talk to Bubba for making new screen sections. Goal is to finish this job by the end of this week.
 
+
#*Standoffs with holes, screws and washers have been cleaned and are being used for thee screen fit up.
 +
#* Once the screen is finalized, all pieces must be UHV cleaned and vacuum fired.
 
# Define layout for installation in CEBAF injector
 
# Define layout for installation in CEBAF injector
 
#*Any updates from Shaun?
 
#*Any updates from Shaun?
 
#*Carlos measured the CEBAF and UITF 14" HV chambers lengths, flange to flange: both measured 18.9". Drawing shows 18.88" ( [[Media:HV chamber gun 14" diameter drawing.pdf]]). The 18" HV chamber measured 19.6" flange to flange, Lesker drawing shows 19.66" ([[media:LeskerPrint.pdf]]). Shaun to verify with S&A numbers and his model, but that means the 18" HV chamber is longer than the 14" HV chamber by 0.78".
 
#*Carlos measured the CEBAF and UITF 14" HV chambers lengths, flange to flange: both measured 18.9". Drawing shows 18.88" ( [[Media:HV chamber gun 14" diameter drawing.pdf]]). The 18" HV chamber measured 19.6" flange to flange, Lesker drawing shows 19.66" ([[media:LeskerPrint.pdf]]). Shaun to verify with S&A numbers and his model, but that means the 18" HV chamber is longer than the 14" HV chamber by 0.78".
 
#*[[Media:14" HV chamber CEBAF injector vacuum piping dimensions.pptx]]
 
#*[[Media:14" HV chamber CEBAF injector vacuum piping dimensions.pptx]]
 
 
# Clean room in LERF Lab 3A
 
# Clean room in LERF Lab 3A
 
#* Clean room has been cleared off
 
#* Clean room has been cleared off
Line 17: Line 16:
 
#* Next is to clean up the clean room and keep it clean
 
#* Next is to clean up the clean room and keep it clean
 
#* Carlos verified that there is nitrogen available in Lab 3A
 
#* Carlos verified that there is nitrogen available in Lab 3A
 
 
# Other items
 
# Other items
 
#* We received a brand new Genie lift (400 lbs capacity) with counterweight.  
 
#* We received a brand new Genie lift (400 lbs capacity) with counterweight.  
 +
#*[[Media:CIS-ASY-R30-3 schedule updated May 16 2022.xlsx]]
  
  

Latest revision as of 15:17, 17 May 2022

Updates

  1. Anode flange designed based on Injector Phase 1 but with two HV ports
    • The used zero length reducer 10" to 4-1/2" flanges from the GTS that looks it has a been baked many times has been machined and is ready for welding the two tubes for the mini-CF HV feedthroughs
  2. Screen Design
    • Bubba made screen sections based on Shaun's drawings from thin and thick wire mesh
    • Marcy and Carlos looked at the screen sections fit inside the HV chamber, Carlos to talk to Bubba for making new screen sections. Goal is to finish this job by the end of this week.
    • Standoffs with holes, screws and washers have been cleaned and are being used for thee screen fit up.
    • Once the screen is finalized, all pieces must be UHV cleaned and vacuum fired.
  3. Define layout for installation in CEBAF injector
  4. Clean room in LERF Lab 3A
    • Clean room has been cleared off
    • Lights have been replaced
    • Next is to clean up the clean room and keep it clean
    • Carlos verified that there is nitrogen available in Lab 3A
  5. Other items


Useful documents


Updates

TEAMS meeting link sent along with invite