: 6" to 4-1/2" reducers => ordered
 
: 6" to 4-1/2" reducers => ordered
 
: (3) FH sent to MMF for mapping
 
: (3) FH sent to MMF for mapping
* BPM process :  Fabricate, Clean, Leak Test, Optical Align, Electrical Acceptance, Gabou Line, Install
+
* BPM process :  Fabricate, Clean, Leak Test, Optical Align, Electrical Acceptance and/or Gabou Line, Install
: (2) M20's : Fab, Clean, Leak, Optical, Gabou
+
: (2) M20's run on Gabou line will go through acceptance check
: (2) M20's (Greg Marble spares) : Fab, Clean, Leak, Optical, Electrical
+
: (2) M20's in vacuum lab post electrical acceptance will go on Gabou line Monday
 +
: Then we'll pick two best and have pre- cut/weld data
 
::M20 Old Assembly Modification [[media:0990.pdf]]
 
::M20 Old Assembly Modification [[media:0990.pdf]]
 
::M20 New Assembly Can [[media:0991.pdf]]
 
::M20 New Assembly Can [[media:0991.pdf]]

Revision as of 12:19, 17 May 2017

200kV Gun

  • Task and Timeline Gantt chart => media:170421_CHG.pdf
  • The electrode is out of the machine shop
    • The key was filed to prevent it from being jammed in the electrode
    • With the key fixed, the electrode assembly was measured by S&A, with and w/o the key. Danny M. compared to the model: "so the height is correct and the pitch is off 0.008 inches. those numbers seem o.k. much better than the previous numbers, and we know the key fits o.k."
  • Bubba polished the electrode with 320 grit sandpaper in prep for barrel polishing with corncob.
  • The electrode has been ultrasonic cleaned in micro in preparation for vacuum firing to 900C.

Gun2 NEG Tube

4.5" rotatable, 2-1/2" bore => ordered
6" to 4-1/2" reducers => ordered
(3) FH sent to MMF for mapping
  • BPM process : Fabricate, Clean, Leak Test, Optical Align, Electrical Acceptance and/or Gabou Line, Install
(2) M20's run on Gabou line will go through acceptance check
(2) M20's in vacuum lab post electrical acceptance will go on Gabou line Monday
Then we'll pick two best and have pre- cut/weld data
M20 Old Assembly Modification media:0990.pdf
M20 New Assembly Can media:0991.pdf
M20 New Assembly 6.00 x 4.500 reducer flangemedia:0.992.pdf

Gun3 Removal and Diagnostics Chamber Installation

Eliminating Gun Switch Software

Software removed and interlocks tested ELOG entry
Yet to do a) remove VBV3I02 from special interlock and b) swap PLC for relays

Spellman HVPS update

Radmon update

Installed at CEBAF Checked and ready

Summer 2017 SAD Update

media:SADCIS_v4.docx