Updates

  1. Anode flange designed based on Injector Phase 1 but with two HV ports
    • The used zero length reducer 10" to 4-1/2" flanges from the GTS that looks it has a been baked many times has been machined
    • The tubes and mini-conflate flanges for the anode and tube biasing feedthroughs are being welded, expect to be done today
  2. Screen Design
    • Bubba and Carlos used Shaun's design as a baseline, but had to change shape a bit to make sure the beaded NEG wires and feedthrough are covered
    • Next, each screen section will be UHV cleaned and vacuum fired, perhaps along with the anode parts
  3. Define layout for installation in CEBAF injector
  4. Clean room in LERF Lab 3A
    • Clean room has been cleared off
    • Lights have been replaced
    • Next is to clean up the clean room and keep it clean
    • Carlos verified that there is nitrogen available in Lab 3A
  5. Other items


Useful documents


Updates

TEAMS meeting link sent along with invite