Difference between revisions of "Meeting 2/3/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "==Agenda== ==First installation== ** remove ~4' pipe in straight passthrough ** add reducer + ceramic break + bubble radiator ** add MIT bates magnet + Mott detector on the s...")
(No difference)

Revision as of 16:06, 2 February 2022

Agenda

First installation

    • remove ~4' pipe in straight passthrough
    • add reducer + ceramic break + bubble radiator
    • add MIT bates magnet + Mott detector on the support table
    • realistic time frame for DAQ

Second installation

    • Replace MIT magnet with Lakshmi's magnet
    • Replace Mott detector with Eric's detector