ME - First installation
- remove ~4' pipe in straight passthrough
- add reducer + ceramic break + bubble radiator
- add MIT bates magnet + Mott detector on the support table
- realistic time frame for DAQ
ME - Second installation
- Replace MIT magnet with Lakshmi's magnet
- Replace Mott detector with Eric's detector