Meeting 2/3/22 - COMTRA

From Ciswikidb
Revision as of 16:06, 2 February 2022 by Grames (talk | contribs) (Created page with "==Agenda== ==First installation== ** remove ~4' pipe in straight passthrough ** add reducer + ceramic break + bubble radiator ** add MIT bates magnet + Mott detector on the s...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Agenda

First installation

    • remove ~4' pipe in straight passthrough
    • add reducer + ceramic break + bubble radiator
    • add MIT bates magnet + Mott detector on the support table
    • realistic time frame for DAQ

Second installation

    • Replace MIT magnet with Lakshmi's magnet
    • Replace Mott detector with Eric's detector