Meeting 2/3/22 - COMTRA
From Ciswikidb
Revision as of 16:06, 2 February 2022 by Grames (Talk | contribs) (Created page with "==Agenda== ==First installation== ** remove ~4' pipe in straight passthrough ** add reducer + ceramic break + bubble radiator ** add MIT bates magnet + Mott detector on the s...")
Agenda
First installation
- remove ~4' pipe in straight passthrough
- add reducer + ceramic break + bubble radiator
- add MIT bates magnet + Mott detector on the support table
- realistic time frame for DAQ
Second installation
- Replace MIT magnet with Lakshmi's magnet
- Replace Mott detector with Eric's detector