Meeting 2/3/22 - COMTRA

From Ciswikidb
Revision as of 16:06, 2 February 2022 by Grames (talk | contribs) (Created page with "==Agenda== ==First installation== ** remove ~4' pipe in straight passthrough ** add reducer + ceramic break + bubble radiator ** add MIT bates magnet + Mott detector on the s...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Agenda

First installation

    • remove ~4' pipe in straight passthrough
    • add reducer + ceramic break + bubble radiator
    • add MIT bates magnet + Mott detector on the support table
    • realistic time frame for DAQ

Second installation

    • Replace MIT magnet with Lakshmi's magnet
    • Replace Mott detector with Eric's detector